flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance

Museums

Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance

The museum is one of NYC’s only major museums with free admission.


By David Malone, Managing Editor | December 20, 2021
Bronx Museum of the Arts new entrance lobby
Courtesy Marvel

Marvel has been selected to design the renovation of a new multi-story entrance and lobby for the Bronx Museum of Arts.

The new renovation will integrate the South Wing into the existing extension, built in 2006, by creating a cohesive architectural whole and a reimagined and spacious lobby. The lobby will include seating, gathering space, and large street-facing walls for artwork. The relocation of the main entrance to the highly-visible corner of Grand Concourse and 165th Street will open up the museum and serve as an expansion of the sidewalk, offering multiple opportunities for art and public programming to be visible from the street.

“With this addition, the Museum will continue to be one of the most vibrant and welcoming spaces for all New Yorkers and visitors, now and in the future,” said Jonathan J. Marvel, Principal Architect, Marvel, in a release. “We are extremely gratified to be a part of this meaningful project, which spans the storied Grand Concourse and celebrates New York City’s rich legacy of cultural inclusion and diversity.”

The Bronx Museum project will be overseen by the New York City Economic Development Corporation. It is slated for completion in 2025.

Tags

Related Stories

Giants 400 | Nov 19, 2021

2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Museums | Nov 10, 2021

Tampa Museum of Art announces $65 million expansion

Weiss/Manfredi is designing the expansion and the renovation of the existing museum building.

Museums | Oct 29, 2021

Rowan University’s new fossil museum sits within an active dinosaur fossil dig

   Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.

Museums | Oct 15, 2021

Kunsthaus Zürich extension opens to the public

David Chipperfield Architects Berlin designed the project.

Museums | Sep 27, 2021

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Renzo Piano Building Workshop designed the project.

Museums | Aug 31, 2021

The Making of Harry Potter tour set to open on former Toshimaen amusement park grounds

Warner Bros. Studio Tour Tokyo will operate the facility.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Museums | Aug 27, 2021

DLR Group to design new facility for Jacksonville’s Museum of Science & History

The  museum has outgrown its location on the Southbank of Downtown Jacksonville.

Museums | Aug 24, 2021

MAD Architects unveils design for Hainan Science and Technology Museum

The project is slated to break ground in late August.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021