flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marvel leads restoration and redesign of El Yunque Visitors’ Center

Reconstruction & Renovation

Marvel leads restoration and redesign of El Yunque Visitors’ Center

The project cost $18.1 million.


By David Malone, Managing Editor | January 24, 2022
El Yunque Visitors’ Center exterior
All photos: Joe Colón

Marvel has recently completed the $18.1 million restoration and redesign of the El Yunque Visitor’s Center, "El Portal," located in the Puerto Rican municipality of Rio Grande. Commissioned by the USDA Forest Service, the project is part of the agency’s focus on strengthening the recreation offerings of El Yunque National Forest, The only tropical rainforest in the U.S. National Forest System.

The reconstruction included the addition of a new entry plaza and gardens that welcome visitors to the center. New passive ventilation was integrated at the exhibit, cafe, and multi-use pavilions, accomplished through new roof structures with clerestory windows and new shading structures. Additionally, a new cafe and a commercial and catering kitchen allow for more diverse uses to the Visitor’s Center.

El Yunque Visitor’s Center cafe

Marvel also designed the only accessible trail in the entire National Forest as part of the project. New interpretative exhibits were designed by Split Rock Studios. The reception desk and interior signage at El Portal were custom-designed and built by Puerto Rico Hardwoods with recycled local mahogany boards from the forest.

After sustaining significant damages from Hurricane Maria, the Visitor’s center has been closed since 2017. The project began in the summer of 2019 and completed in December 2021. It officially reopened on January 20, 2022.

El Yunque Visitor’s Center exhibits

El Yunque Visitor’s Center cafe

El Yunque Visitor’s Center exterior path

Related Stories

| Jan 12, 2012

CSHQA receives AIA Northwest & Pacific Region Merit Award for Idaho State Capitol restoration

After a century of service, use, and countless modifications which eroded the historical character of the building and grounds, the restoration brought the 200,000-sf building back to its former grandeur by restoring historical elements, preserving existing materials, and rehabilitating spaces for contemporary uses.

| Jan 6, 2012

Summit Design+Build completes Park Place in Illinois

Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.

| Jan 4, 2012

Shawmut Design & Construction awarded dorm renovations at Brown University

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

| Jan 3, 2012

The Value of Historic Paint Investigations

An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors. 

| Jan 3, 2012

28th Annual Reconstruction Awards: Bringing Hope to Cancer Patients

A gothic-style structure is reconstructed into comfortable, modern patient residence facility for the American Cancer Society.

| Jan 3, 2012

Rental Renaissance, The Rebirth of the Apartment Market

Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 27, 2011

Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola

Topping off ceremony held on 238th Anniversary of Boston Tea Party.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021