flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marriott has the largest construction pipeline of any franchise company in the U.S.

Hotel Facilities

Marriott has the largest construction pipeline of any franchise company in the U.S.

Marriott has the most rooms currently under construction with 482 Projects/67,434 Rooms.


By Lodging Econometrics | September 6, 2017
Rooms lining a hotel hallway

Pixabay Public Domain

Marriott International currently has the largest construction pipeline of any franchise company with 1,288 Projects/166,096 Rooms. Their largest brands in the Pipeline are: Fairfield Inn with 283 Projects/27,244 Rooms, Residence Inn with 187 Projects/23,617 Rooms and TownePlace Suites with 184 Projects/18,757 Rooms.

Marriott has the most rooms currently Under Construction with 482 Projects/67,434 Rooms, which represents almost 1/3 of all Pipeline rooms Under Construction. Additionally, they have the most rooms Scheduled to Start Construction in the Next 12 Months with 619 Projects/76,451 Rooms. Marriott also has 187 Projects/22,211 Rooms in Early Planning,

In the first half of the year, Marriott opened 120 new hotels with 14,071 rooms, accounting for 27% of all new hotels opened this year. The Marriott brands with the largest number of new hotels opened this year are Fairfield Inn with 31 Hotels/2,887 Rooms and Courtyard with 18 Hotels/2,104 Rooms.

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| May 22, 2012

Batson-Cook names Partin VP of Business Development

Partin joins general contractor from Georgia Hospital Association.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021