flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marines plan first net zero energy military base

Codes and Standards

Marines plan first net zero energy military base

The Albany, Ga., site will have ground source heat pumps and a biomass generator.


By Peter Fabris, Contributing Editor | November 28, 2016

Wikimedia Commons Public Domain

The Marine Corps plans to make its logistics base in Albany, Ga., the nation’s first net zero energy military base.

The project will reduce energy use, increase energy security, and meet energy demands from renewable sources. The project will include a ground source heat pump system, an 8.5-megawatt biomass-fueled, steam-to-electricity (STE) generator, high-efficiency transformers, lighting and boiler upgrades, system controls for a landfill gas electricity generator, and centralized monitoring and operation of electricity generation and distribution.

Base officials estimate efficiency measures will reduce total annual electrical consumption by 15% (7,200 megawatt-hours) annually. The base will achieve net zero status as annual energy demand will be fully met by renewable energy produced on site.

The base is comprised of 3,600 acres, nearly 400 facilities, and Marine Corps-owned and operated utility systems. Achieving net zero will be possible with the availability of renewable energy steam supply that the base will buy from a 50-megawatt biomass plant located at Procter & Gamble’s neighboring facility.

Related Stories

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

Codes and Standards | Jan 13, 2020

Kansas City is first in nation to offer free public transportation

Aim is to increase mobility to spur more economic activity.

Codes and Standards | Jan 9, 2020

Dept. of Defense will require beefed up cybersecurity standards in January

All contractors will have to demonstrate secure practices.

Codes and Standards | Jan 8, 2020

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.

Codes and Standards | Jan 8, 2020

Energy efficiency initiatives have significantly cut energy consumption per square foot

Lighting and space heating fell by more than 600 trillion Btu from 2003 to 2012.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

Codes and Standards | Jan 7, 2020

New certification program for rigid core luxury vinyl tile

ASSURE CERTIFIED to establish industry-wide quality standards.

Codes and Standards | Jan 7, 2020

Boston’s beefed up wetlands ordinance will limit development

Conservation commission must consider future climate impacts when assessing new projects.

Codes and Standards | Jan 6, 2020

States pick up the slack in efficiency policy as federal government lags

With climate change deniers setting policy in Trump Administration, progress continues in statehouses.

Codes and Standards | Jan 6, 2020

OSHA plans multiple revisions to rules impacting construction industry in 2020

Cranes and derricks, welding in confined spaces, beryllium exposure, and more on docket.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021