The Marine Corps plans to make its logistics base in Albany, Ga., the nation’s first net zero energy military base.
The project will reduce energy use, increase energy security, and meet energy demands from renewable sources. The project will include a ground source heat pump system, an 8.5-megawatt biomass-fueled, steam-to-electricity (STE) generator, high-efficiency transformers, lighting and boiler upgrades, system controls for a landfill gas electricity generator, and centralized monitoring and operation of electricity generation and distribution.
Base officials estimate efficiency measures will reduce total annual electrical consumption by 15% (7,200 megawatt-hours) annually. The base will achieve net zero status as annual energy demand will be fully met by renewable energy produced on site.
The base is comprised of 3,600 acres, nearly 400 facilities, and Marine Corps-owned and operated utility systems. Achieving net zero will be possible with the availability of renewable energy steam supply that the base will buy from a 50-megawatt biomass plant located at Procter & Gamble’s neighboring facility.
Related Stories
Codes and Standards | Apr 23, 2020
COVID-19 epidemic demonstrates value of flexible hospital space
Some rooms being repurposed for ICU care.
Codes and Standards | Apr 15, 2020
Embodied carbon footprint can be reduced by using conventional materials
High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.
Coronavirus | Apr 13, 2020
COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open
Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online.
Codes and Standards | Apr 13, 2020
Design competition focuses on reducing urban heat island effect
Cool Abu Dhabi aims to transform urban life in the Middle East.
Codes and Standards | Apr 13, 2020
What building science says about reducing COVID-19 transmission
Impact of temperature and relative humidity is unclear.
Codes and Standards | Apr 9, 2020
Owners retrofitting properties, monitoring performance during epidemic
Covid-19 outbreak may lead employers to reevaluate office commitments.
Codes and Standards | Apr 7, 2020
Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave
Includes fact sheets for employees, employers, and a questions and answers document.
Codes and Standards | Apr 1, 2020
Standards and codes meetings halted, postponed
ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.
Codes and Standards | Mar 26, 2020
Ransomware attack on Canadian contractor underscores need for cybersecurity
Victimized company Bird Construction has defense, law enforcement contracts.
Codes and Standards | Mar 23, 2020
Contractors should scrutinize contracts carefully amid Covid-19 crisis
Compliance with time-sensitive notice requirements and careful documentation required.