flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Margulies Perruzzi Architects completes office design for Pioneer Investments

Margulies Perruzzi Architects completes office design for Pioneer Investments

MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.


By Posted by Tim Gregorski, Senior Editor | September 13, 2012
MPA redesigned workspaces, conference rooms, lobbies, reception areas and select
MPA redesigned workspaces, conference rooms, lobbies, reception areas and selected new finishes, furniture, and lighting. Photo

Margulies Perruzzi Architects has completed the design of 100,000-sf of office space in Boston for Pioneer Investments, a global investment firm.

Providing space planning and interior design services, MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street. MPA crafted a master plan to help Pioneer strategize how to best utilize this space on a long-term basis, and completely redesigned the 16th floor, embracing an open layout with fewer private offices and creating a model for Pioneer’s future space planning.

MPA redesigned workspaces, conference rooms, lobbies, reception areas and selected new finishes, furniture, and lighting. The project included a major reconfiguration of Pioneer’s IT/mission critical spaces and the addition of a conference center featuring a suite of conference rooms with a large breakout area. In order to allow Pioneer’s operations to continue during construction, MPA phased the renovation schedule and utilized available swing space.

Photo credit: Warren Patterson

Related Stories

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021