After Superstorm Sandy, New York City revised its building codes in 2013 to make buildings more resilient to flooding.
But landlords of most buildings in the flood plain have not been required to meet these flood-prevention standards, and many structures remain vulnerable to similar weather events. The new requirements include raising structures above flood elevation or flood-proofing buildings below that point, and ensuring that residents on higher floors can access potable water if electric water pumps fail.
So far, just 549 structures have hit the substantial alteration threshold when renovations amount to at least 50% of the building value—a trigger requiring the owner to adhere to the new code. To date, 1,131 new buildings have been constructed in the flood plain that abide by the new code.
According to the city, 75,786 other buildings constructed in the flood plain before 2013 have not completed a flood resilience retrofit. Some, though, have been prompted by their insurance providers to lift generators and boilers onto higher floors and harden their infrastructure. This work, however, may not be as comprehensive as fully abiding by the new code.
Related Stories
Codes and Standards | Mar 23, 2020
Florida legislature passes bill to reduce retainage on state and local projects
House and Senate vote is nearly unanimous; law would go into effect Oct. 1.
Codes and Standards | Mar 20, 2020
Feds prod use of eminent domain to force people out of flood-prone homes
Local officials that don’t comply could lose federal money to combat climate change.
Codes and Standards | Mar 19, 2020
ASHRAE provides COVID-19 resources for operating, maintaining HVAC systems
Includes recently approved position document on Airborne Infectious Diseases.
Codes and Standards | Mar 19, 2020
CaGBC launches new version of its Zero Carbon Building Standard
Version 2 draws on lessons from more than 20 zero carbon projects.
Codes and Standards | Mar 16, 2020
Concrete industry reduces carbon footprint by 13% over five years
Result mostly due to more efficient use of Portland cement.
Resiliency | Mar 13, 2020
Feds push use of eminent domain to force people out of flood-prone homes
Local officials that don’t comply could lose federal money to combat climate change.
Codes and Standards | Mar 12, 2020
Design guide for sloped glazing and skylights updated for first time in 30 years
Helps with choosing proper glass for non-residential applications.
Codes and Standards | Mar 11, 2020
Two tree species native to the Northeast found suitable for CLT
Eastern white pine and eastern hemlock pass strength testing.
Codes and Standards | Mar 10, 2020
Prescient receives ICC certification for seismic resilience system
Technology suitable for buildings up to 12 stories in earthquake-prone areas.
Codes and Standards | Mar 6, 2020
Design firms creating plans to re-imagine D.C.’s tidal basin
Area including National Mall is facing increased flood risk.