After Superstorm Sandy, New York City revised its building codes in 2013 to make buildings more resilient to flooding.
But landlords of most buildings in the flood plain have not been required to meet these flood-prevention standards, and many structures remain vulnerable to similar weather events. The new requirements include raising structures above flood elevation or flood-proofing buildings below that point, and ensuring that residents on higher floors can access potable water if electric water pumps fail.
So far, just 549 structures have hit the substantial alteration threshold when renovations amount to at least 50% of the building value—a trigger requiring the owner to adhere to the new code. To date, 1,131 new buildings have been constructed in the flood plain that abide by the new code.
According to the city, 75,786 other buildings constructed in the flood plain before 2013 have not completed a flood resilience retrofit. Some, though, have been prompted by their insurance providers to lift generators and boilers onto higher floors and harden their infrastructure. This work, however, may not be as comprehensive as fully abiding by the new code.
Related Stories
Codes and Standards | Sep 16, 2016
Calm weather tidal flooding impacting several communities on East and Gulf Coasts
Local officials face the prospect of costly mitigation projects.
Codes and Standards | Sep 15, 2016
OSHA appoints new director for its construction directorate
The forty-year industry veteran has been a GC and business owner.
Energy | Sep 13, 2016
Oberlin College to hold conference on post-fossil fuel economy
The gathering will address climate change and new sources of energy.
Industry Research | Sep 12, 2016
Evidence linking classroom design to improved learning mounts
A study finds the impact can be as much as 25% per year.
Legislation | Sep 8, 2016
Half of U.S. states now allow design-build on public projects
Missouri is the latest to enact design-build legislation.
Codes and Standards | Sep 8, 2016
Vapor intrusion risk addressed in new ASTM guide update
The updates address industry confusion over how to handle the issue.
BIM and Information Technology | Sep 7, 2016
Energy Star Portfolio Manager tool updated to factor in waste management
The costs and benefits of managing 29 types of waste are now included.
Wood | Sep 6, 2016
Atlanta suburb prohibits wood-framed construction for high rises
The new building code prevents any structure with more than three stories from being built from a CLT frame.
Codes and Standards | Sep 1, 2016
Overuse of air conditioning hurts office productivity
A study found temperatures in the low 70s reduce worker performance.
Regulations | Aug 31, 2016
FEMA wants to toughen flood regulation on projects using federal funds
The proposal ‘would essentially rewrite the current 100-year flood standard.’