flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Many New York City landlords have not addressed new flood codes

Codes and Standards

Many New York City landlords have not addressed new flood codes

City revised building codes after Superstorm Sandy, but many owners not required to upgrade.


By Peter Fabris, Contributing Editor | November 29, 2017

After Superstorm Sandy, New York City revised its building codes in 2013 to make buildings more resilient to flooding.

But landlords of most buildings in the flood plain have not been required to meet these flood-prevention standards, and many structures remain vulnerable to similar weather events. The new requirements include raising structures above flood elevation or flood-proofing buildings below that point, and ensuring that residents on higher floors can access potable water if electric water pumps fail.

So far, just 549 structures have hit the substantial alteration threshold when renovations amount to at least 50% of the building value—a trigger requiring the owner to adhere to the new code. To date, 1,131 new buildings have been constructed in the flood plain that abide by the new code.

According to the city, 75,786 other buildings constructed in the flood plain before 2013 have not completed a flood resilience retrofit. Some, though, have been prompted by their insurance providers to lift generators and boilers onto higher floors and harden their infrastructure. This work, however, may not be as comprehensive as fully abiding by the new code.

Related Stories

Codes and Standards | Dec 14, 2016

Cities must invest $375 billion to avoid catastrophic global climate change

C40 Cities Climate Leadership Group advocates low carbon infrastructure.

Codes and Standards | Dec 14, 2016

Resilient construction techniques pay for themselves over lifetime of buildings

Spending $340,000 for resiliency would pay for itself over the lifetime of a $10 million structure.

Codes and Standards | Dec 12, 2016

Dept. of Energy launches program to advance zero energy school design

Six school districts and two states are among the first to mainstream zero energy schools.

Codes and Standards | Dec 9, 2016

California city’s plan for net zero building includes net zero water usage

Santa Monica city services building aims for highest level of sustainability.

Codes and Standards | Dec 8, 2016

WELL and BREEAM to align standards

The goal is to make it easier for projects pursuing both standards.

Codes and Standards | Dec 7, 2016

U.S. lumber industry pushes for import duties on Canadian softwood

The industry claims the product is being sold below fair market value.

Codes and Standards | Dec 5, 2016

International Construction Measurement Standards draft released

The goal is to improve consistency for calculating costs and reducing risk.

Codes and Standards | Dec 2, 2016

D.C. Council passes bill to reduce number of blighted properties

The new legislation reduces the amount of time a vacant property can qualify for a lower tax rate.

Codes and Standards | Dec 1, 2016

Passive House standard gaining influence in commercial sector

Some industry watchers predict it will become the base building code. 

Codes and Standards | Nov 30, 2016

Researchers finding solutions to bird/building collisions

Glass facades pose a serious risk to birds and cause millions of avian deaths each year.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021