flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manhattan Construction Co. to build Fairfax office building

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.


By Posted by Tim Gregorski, Senior Editor | Tim Gregorski | September 7, 2012
Fairfaxs new building will house behavioral healthcare services of the Fairfax-
Fairfaxs new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including

Fairfax County Board of Supervisors in Virginia awarded Manhattan Construction Co. the contract to build a new office building and parking garage in Fairfax, Va. The contract is approximately $48.5 million and includes construction of a five-story, 200,000-sf building and a 230,000-sf parking garage. The project is managed by the Fairfax County Department of Public Works and Environmental Services.

This is the second project Manhattan has contracted with the County to build, said Lee. Manhattan completed the McConnell Public Safety and Transportation Operations Center and Forensics Facility in 2008 for which the company was honored as Contractor of the Year by the American Public Works Association - Virginia/DC/Maryland Chapter.

When complete, Fairfax’s new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including 24/7 emergency services.

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

The exterior of the building and garage will feature architectural precast concrete, metal panels, punched and ribbon windows, and glazed curtain wall. The base of the building will be clad in natural stone.

The 712-space cast-in-place parking garage includes a “Limelight” lighting control system designed to provide a 65 percent reduction in energy costs when compared to regular systems. The system includes motion sensors and instant notification of any light?out scenario through e-mail or pda messages. +

Related Stories

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021