flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manhattan Construction Co. to build Fairfax office building

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.


By Posted by Tim Gregorski, Senior Editor | Tim Gregorski | September 7, 2012
Fairfaxs new building will house behavioral healthcare services of the Fairfax-
Fairfaxs new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including

Fairfax County Board of Supervisors in Virginia awarded Manhattan Construction Co. the contract to build a new office building and parking garage in Fairfax, Va. The contract is approximately $48.5 million and includes construction of a five-story, 200,000-sf building and a 230,000-sf parking garage. The project is managed by the Fairfax County Department of Public Works and Environmental Services.

This is the second project Manhattan has contracted with the County to build, said Lee. Manhattan completed the McConnell Public Safety and Transportation Operations Center and Forensics Facility in 2008 for which the company was honored as Contractor of the Year by the American Public Works Association - Virginia/DC/Maryland Chapter.

When complete, Fairfax’s new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including 24/7 emergency services.

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

The exterior of the building and garage will feature architectural precast concrete, metal panels, punched and ribbon windows, and glazed curtain wall. The base of the building will be clad in natural stone.

The 712-space cast-in-place parking garage includes a “Limelight” lighting control system designed to provide a 65 percent reduction in energy costs when compared to regular systems. The system includes motion sensors and instant notification of any light?out scenario through e-mail or pda messages. +

Related Stories

| Feb 20, 2012

Sto Corp. announces new technical director for Canada

Edgar will have full responsibility of specifications, details, website technical content, testing and approvals, and will support the Canada sales team.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 20, 2012

All Steel names Breagy director of metro New York

Breagy is responsible for overseeing this region’s sales team while strategically coordinating the sales efforts of Allsteel dealers and representatives in the tri-state area.

| Feb 17, 2012

Tremco Inc. headquarters achieves LEED Gold certification

Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.

| Feb 17, 2012

MacInnis joins Gilbane board of directors

MacInnis is the chairman and recently retired CEO of Connecticut-based EMCOR Group, Inc.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 16, 2012

TLC Engineering for Architecture opens Chattanooga office

TLC Engineering for Architecture provides mechanical, electrical, structural, plumbing, fire protection, communication, technology, LEED, commissioning and energy auditing services.

| Feb 16, 2012

Summit Design + Build begins build-out for Emmi Solutions in Chicago

The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.

| Feb 16, 2012

Highland named president of McCarthy Building Companies’ California region

Highland moved into this new role in January 2012 following a six-month transition period with Carter Chappell, the company’s former president, California region.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â