flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manhattan Construction Co. to build Fairfax office building

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.


By Posted by Tim Gregorski, Senior Editor | Tim Gregorski | September 7, 2012
Fairfaxs new building will house behavioral healthcare services of the Fairfax-
Fairfaxs new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including

Fairfax County Board of Supervisors in Virginia awarded Manhattan Construction Co. the contract to build a new office building and parking garage in Fairfax, Va. The contract is approximately $48.5 million and includes construction of a five-story, 200,000-sf building and a 230,000-sf parking garage. The project is managed by the Fairfax County Department of Public Works and Environmental Services.

This is the second project Manhattan has contracted with the County to build, said Lee. Manhattan completed the McConnell Public Safety and Transportation Operations Center and Forensics Facility in 2008 for which the company was honored as Contractor of the Year by the American Public Works Association - Virginia/DC/Maryland Chapter.

When complete, Fairfax’s new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including 24/7 emergency services.

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

The exterior of the building and garage will feature architectural precast concrete, metal panels, punched and ribbon windows, and glazed curtain wall. The base of the building will be clad in natural stone.

The 712-space cast-in-place parking garage includes a “Limelight” lighting control system designed to provide a 65 percent reduction in energy costs when compared to regular systems. The system includes motion sensors and instant notification of any light?out scenario through e-mail or pda messages. +

Related Stories

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 26, 2012

Los Angeles County to host free green building training

Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.

| Mar 26, 2012

Ball State University completes nation's largest ground-source geothermal system

Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.

| Mar 22, 2012

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 

| Mar 22, 2012

Moline Public Library uses copper as an exterior building material

Architects incorporate decorative copper panels to create the look of a heavy plate copper shingle. 

| Mar 21, 2012

10 common data center surprises

Technologies and best practices provide path for better preparation.

| Mar 21, 2012

ABI remains positive for fourth straight month

Highest spike in inquiries for new projects since 2007.

| Mar 21, 2012

Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms. 

| Mar 21, 2012

Clary, Hendrickson named regional directors for HDR Architecture

New directors will be responsible for expanding and strengthening the firm throughout the central region. 

| Mar 20, 2012

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021