Fairfax County Board of Supervisors in Virginia awarded Manhattan Construction Co. the contract to build a new office building and parking garage in Fairfax, Va. The contract is approximately $48.5 million and includes construction of a five-story, 200,000-sf building and a 230,000-sf parking garage. The project is managed by the Fairfax County Department of Public Works and Environmental Services.
This is the second project Manhattan has contracted with the County to build, said Lee. Manhattan completed the McConnell Public Safety and Transportation Operations Center and Forensics Facility in 2008 for which the company was honored as Contractor of the Year by the American Public Works Association - Virginia/DC/Maryland Chapter.
When complete, Fairfax’s new building will house behavioral healthcare services of the Fairfax-Falls Church Community Services Board, including 24/7 emergency services.
Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.
The exterior of the building and garage will feature architectural precast concrete, metal panels, punched and ribbon windows, and glazed curtain wall. The base of the building will be clad in natural stone.
The 712-space cast-in-place parking garage includes a “Limelight” lighting control system designed to provide a 65 percent reduction in energy costs when compared to regular systems. The system includes motion sensors and instant notification of any light?out scenario through e-mail or pda messages. +
Related Stories
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.