flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manchester modular hotel is constructed of shipping containers

Hotel Facilities

Manchester modular hotel is constructed of shipping containers

The 220-room Holiday Inn Express hopes to be completed in less than 12 months.


By David Malone, Associate Editor | May 18, 2017

Rendering courtesy of Chapman Taylor

Purpose built shipping containers are being used in the construction of a modular 220-room Holiday Inn Express in Trafford City, Manchester, UK.

The shipping containers come with fully factory finished interior fixtures and fittings that are installed before being delivered to the site. Additionally, the rooms have full height windows and are fully furnished before leaving the factory.

In order to make the off-site modular design the hotel uses work, Chapman Taylor, the architect for the project, developed a fully coordinated BIM model to inform the detailed design and enable the off-site works to commence. Chapman Taylor and Bowmer & Kirkland, the contractor, hope to deliver the project in less than 12 months.

 

Rendering courtesy of Chapman Taylor.

 

Construction of the ground floor and podium structure is underway on site while, simultaneously, the bedroom modules are being manufactured off-site. Once delivered, the modules will be stacked on top of the podium structure. Each of the 220 guest room modules will be installed within a two to four week period.

One module comprises two fully furnished en-suite rooms that are separated by a section of circulation corridor. Once the modules are in place on site, the external envelope, which consists of prefinished rainscreen cladding and single ply roofing systems, is applied.

The project is a joint venture between Mill Lane Estates, Topland Group, and Marick.

Related Stories

Reconstruction & Renovation | Mar 30, 2017

Waldorf Astoria New York to undergo massive renovation

Skidmore, Owings & Merrill and Pierre-Yves Rochon prepared the designs for what will be one of the most complex and intensive landmark preservation efforts in New York City history.

Hotel Facilities | Mar 14, 2017

Hotels are becoming the favored places for retailers and consumer products to bolster their brands

Several high-profile names have launched hospitality divisions, often with well-established management partners.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Hotel Facilities | Feb 20, 2017

The future of hotel design: Human-centered

Change is inevitable and it impacts on everything, not least on the way we design.

Market Data | Feb 16, 2017

How does your hospital stack up? Grumman/Butkus Associates 2016 Hospital Benchmarking Survey

Report examines electricity, fossil fuel, water/sewer, and carbon footprint.

Hotel Facilities | Feb 15, 2017

Morphosis redesigns Swiss hotel rooms as custom ‘aesthetic experiences’

The redesigned rooms focused on scale, color, tactility, unexpected form, and connections to the natural context.

Hotel Facilities | Jan 30, 2017

New renderings of the 1966 Century Plaza Hotel’s redevelopment

The redevelopment project got underway last summer and is expected to be completed in 2018.

Hotel Facilities | Jan 25, 2017

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021