flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manchester modular hotel is constructed of shipping containers

Hotel Facilities

Manchester modular hotel is constructed of shipping containers

The 220-room Holiday Inn Express hopes to be completed in less than 12 months.


By David Malone, Associate Editor | May 18, 2017

Rendering courtesy of Chapman Taylor

Purpose built shipping containers are being used in the construction of a modular 220-room Holiday Inn Express in Trafford City, Manchester, UK.

The shipping containers come with fully factory finished interior fixtures and fittings that are installed before being delivered to the site. Additionally, the rooms have full height windows and are fully furnished before leaving the factory.

In order to make the off-site modular design the hotel uses work, Chapman Taylor, the architect for the project, developed a fully coordinated BIM model to inform the detailed design and enable the off-site works to commence. Chapman Taylor and Bowmer & Kirkland, the contractor, hope to deliver the project in less than 12 months.

 

Rendering courtesy of Chapman Taylor.

 

Construction of the ground floor and podium structure is underway on site while, simultaneously, the bedroom modules are being manufactured off-site. Once delivered, the modules will be stacked on top of the podium structure. Each of the 220 guest room modules will be installed within a two to four week period.

One module comprises two fully furnished en-suite rooms that are separated by a section of circulation corridor. Once the modules are in place on site, the external envelope, which consists of prefinished rainscreen cladding and single ply roofing systems, is applied.

The project is a joint venture between Mill Lane Estates, Topland Group, and Marick.

Related Stories

Modular Building | Oct 12, 2018

DeSimone Consulting Engineers designs the tallest modular hotel in the United States

The hotel was originally designed as a cast-in-place concrete structure.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Reconstruction & Renovation | Aug 21, 2018

The massive facelift of New York’s famed Waldorf Astoria moves into Phase Two

The refurbished hotel will feature fewer, but larger, guest rooms.

Hotel Facilities | Aug 10, 2018

How hospitality design makes spaces of all types better for users

Responding to these shifting expectations, building owners and design teams working in other markets now regularly embrace leading ideas from the world of hospitality and infuse them into their projects.

Hotel Facilities | Aug 1, 2018

'Home away from home' is hoteliers' newest theme

Creating an experience, with the accent on local color, is flavoring hotel design.

Mixed-Use | Jul 17, 2018

Water Street Tampa’s developer reveals details about this project’s public spaces

This $3 billion waterfront neighborhood will also include three hotels.

Sponsored | Hotel Facilities | Jul 13, 2018

Hotel renovation: More than just minding the dust

Do you know the vital signs for avoiding moisture & mold problems? Will your brand standards cause you headaches? How will you recover costs if you do get into trouble?

Adaptive Reuse | Jul 9, 2018

Work, park, live: Inside Cincinnati’s parking garage turned lifestyle hotel

The Summit hotel and conference center is a converted parking garage that was once a factory.

| May 30, 2018

Accelerate Live! talk: An AEC giant’s roadmap for integrating design, manufacturing, and construction

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), Skender CEO Mark Skender and Chief Design Officer Tim Swanson present the construction giant’s vision for creating a manufacturing-minded, vertically-integrated design-manufacturing-build business model.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021