Joe Mamayek, AIA, LEED AP B+C, has joined HDR Architecture’s Boston, Massachusetts office as a Design Principal. Mamayek will lead design efforts on marketing pursuits and all projects coming out of the Boston office, and will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
He is an award-winning designer who has worked on a broad variety of complex, large-scale projects. Most recently, he was Director of Architectural Design at TRO/Jung Brannen where he led design initiatives on projects ranging from museum galleries to complex commercial developments at both a local and international level. He also has a strong background in S+T and healthcare facilities, two of HDR Architecture’s strongest markets. Some of Mamayek’s notable projects include various galleries and pavilions for the Museum of Fine Arts in Boston, Massachusetts; the Media One Tower in Dubai, UAE; the Maine General Medical Center in Augusta, Maine; and the Praecis Pharmaceuticals Headquarters in Waltham, Massachusetts, which won an AIA Honor Award for Design Excellence.
Mamyek is an active leader in local design affiliations, including the Boston Society of Architects and the ABC (A Better City) Sustainability Task Force. He’s also taught at the Boston Architectural Center as an instructor and thesis advisor. He’s a winner of the prestigious ROTCH Travelling Scholarship, which provided him the opportunity to study abroad for a year, and served on the ROTCH Committee for six years. Joe has a Bachelor of Architecture and a Bachelor of Environmental Design degree from the University of Minnesota. +
Related Stories
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.