flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mamayek joins HDR as Design Principal in Boston

Mamayek joins HDR as Design Principal in Boston

He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.


By Posted by Tim Gregorski, Senior Editor | August 29, 2012
Joe Mamayek, AIA, LEED AP B+C
Joe Mamayek, AIA, LEED AP B+C
This article first appeared in the October 2012 issue of BD+C.

Joe Mamayek, AIA, LEED AP B+C, has joined HDR Architecture’s Boston, Massachusetts office as a Design Principal. Mamayek will lead design efforts on marketing pursuits and all projects coming out of the Boston office, and will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.

He is an award-winning designer who has worked on a broad variety of complex, large-scale projects. Most recently, he was Director of Architectural Design at TRO/Jung Brannen where he led design initiatives on projects ranging from museum galleries to complex commercial developments at both a local and international level. He also has a strong background in S+T and healthcare facilities, two of HDR Architecture’s strongest markets. Some of Mamayek’s notable projects include various galleries and pavilions for the Museum of Fine Arts in Boston, Massachusetts; the Media One Tower in Dubai, UAE; the Maine General Medical Center in Augusta, Maine; and the Praecis Pharmaceuticals Headquarters in Waltham, Massachusetts, which won an AIA Honor Award for Design Excellence.

Mamyek is an active leader in local design affiliations, including the Boston Society of Architects and the ABC (A Better City) Sustainability Task Force. He’s also taught at the Boston Architectural Center as an instructor and thesis advisor. He’s a winner of the prestigious ROTCH Travelling Scholarship, which provided him the opportunity to study abroad for a year, and served on the ROTCH Committee for six years. Joe has a Bachelor of Architecture and a Bachelor of Environmental Design degree from the University of Minnesota. +

Related Stories

| Apr 13, 2011

Virginia hospital’s prescription for green construction: LEED Gold

Rockingham Memorial Hospital in Harrisonburg, Va., is the commonwealth’s first inpatient healthcare facility to earn LEED Gold. The 630,000-sf facility was designed by Earl Swensson Associates, with commissioning consultant SSRCx, both of Nashville.

| Apr 13, 2011

Office interaction was the critical element to Boston buildout

Margulies Perruzzi Architects, Boston, designed the new 11,460-sf offices for consultant Interaction Associates and its nonprofit sister organization, The Interaction Institute for Social Change, inside an old warehouse near Boston’s Seaport Center.

| Apr 13, 2011

Expanded Museum of the Moving Image provides a treat for the eyes

The expansion and renovation of the Museum of the Moving Image in the Astoria section of Queens, N.Y., involved a complete redesign of its first floor and the construction of a three-story 47,000-sf addition.

| Apr 13, 2011

Duke University parking garage driven to LEED certification

People parking their cars inside the new Research Drive garage at Duke University are making history—they’re utilizing the country’s first freestanding LEED-certified parking structure.

| Apr 13, 2011

Red Bull Canada HQ a mix of fluid spaces and high-energy design

The Toronto architecture firm Johnson Chou likes to put a twist on its pared-down interiors, and its work on the headquarters for Red Bull Canada is no exception. The energy drink maker occupies 12,300 sf on the top two floors of a three-story industrial building in Toronto, and the design strategy for its space called for leaving the base building virtually untouched while attention was turned to the interior architecture.

| Apr 13, 2011

Former department store gets new lease on life as MaineHealth HQ

The long-vacant Sears Roebuck building in Portland, Maine, was redeveloped into the corporate headquarters for MaineHealth. Consigli Construction and local firm Harriman Architects + Engineers handled the 14-month fast-track project, transforming the 89,000-sf, four-story facility for just $100/sf.

| Apr 12, 2011

Rutgers students offered choice of food and dining facilities

The Livingston Dining Commons at Rutgers University’s Livingston Campus in New Brunswick, N.J., was designed by Biber Partnership, Summit, N.J., to offer three different dining rooms that connect to a central servery.

| Apr 12, 2011

Retail complex enjoys prime Abu Dhabi location

The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.

| Apr 12, 2011

Luxury New York high rise adjacent to the High Line

Located adjacent to New York City’s High Line Park, 500 West 23rd Street will offer 111 luxury rental apartments when it opens later this year.

| Apr 12, 2011

College of New Jersey facility will teach teachers how to teach

The College of New Jersey broke ground on its 79,000-sf School of Education building in Ewing, N.J.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021