flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mamayek joins HDR as Design Principal in Boston

Mamayek joins HDR as Design Principal in Boston

He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.


By Posted by Tim Gregorski, Senior Editor | August 29, 2012
Joe Mamayek, AIA, LEED AP B+C
Joe Mamayek, AIA, LEED AP B+C
This article first appeared in the October 2012 issue of BD+C.

Joe Mamayek, AIA, LEED AP B+C, has joined HDR Architecture’s Boston, Massachusetts office as a Design Principal. Mamayek will lead design efforts on marketing pursuits and all projects coming out of the Boston office, and will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.

He is an award-winning designer who has worked on a broad variety of complex, large-scale projects. Most recently, he was Director of Architectural Design at TRO/Jung Brannen where he led design initiatives on projects ranging from museum galleries to complex commercial developments at both a local and international level. He also has a strong background in S+T and healthcare facilities, two of HDR Architecture’s strongest markets. Some of Mamayek’s notable projects include various galleries and pavilions for the Museum of Fine Arts in Boston, Massachusetts; the Media One Tower in Dubai, UAE; the Maine General Medical Center in Augusta, Maine; and the Praecis Pharmaceuticals Headquarters in Waltham, Massachusetts, which won an AIA Honor Award for Design Excellence.

Mamyek is an active leader in local design affiliations, including the Boston Society of Architects and the ABC (A Better City) Sustainability Task Force. He’s also taught at the Boston Architectural Center as an instructor and thesis advisor. He’s a winner of the prestigious ROTCH Travelling Scholarship, which provided him the opportunity to study abroad for a year, and served on the ROTCH Committee for six years. Joe has a Bachelor of Architecture and a Bachelor of Environmental Design degree from the University of Minnesota. +

Related Stories

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021