Joe Mamayek, AIA, LEED AP B+C, has joined HDR Architecture’s Boston, Massachusetts office as a Design Principal. Mamayek will lead design efforts on marketing pursuits and all projects coming out of the Boston office, and will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
He is an award-winning designer who has worked on a broad variety of complex, large-scale projects. Most recently, he was Director of Architectural Design at TRO/Jung Brannen where he led design initiatives on projects ranging from museum galleries to complex commercial developments at both a local and international level. He also has a strong background in S+T and healthcare facilities, two of HDR Architecture’s strongest markets. Some of Mamayek’s notable projects include various galleries and pavilions for the Museum of Fine Arts in Boston, Massachusetts; the Media One Tower in Dubai, UAE; the Maine General Medical Center in Augusta, Maine; and the Praecis Pharmaceuticals Headquarters in Waltham, Massachusetts, which won an AIA Honor Award for Design Excellence.
Mamyek is an active leader in local design affiliations, including the Boston Society of Architects and the ABC (A Better City) Sustainability Task Force. He’s also taught at the Boston Architectural Center as an instructor and thesis advisor. He’s a winner of the prestigious ROTCH Travelling Scholarship, which provided him the opportunity to study abroad for a year, and served on the ROTCH Committee for six years. Joe has a Bachelor of Architecture and a Bachelor of Environmental Design degree from the University of Minnesota. +
Related Stories
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Feb 1, 2012
‘Augmented reality’ comes to the job site
A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.