flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mamayek joins HDR as Design Principal in Boston

Mamayek joins HDR as Design Principal in Boston

He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.


By Posted by Tim Gregorski, Senior Editor | August 29, 2012
Joe Mamayek, AIA, LEED AP B+C
Joe Mamayek, AIA, LEED AP B+C
This article first appeared in the October 2012 issue of BD+C.

Joe Mamayek, AIA, LEED AP B+C, has joined HDR Architecture’s Boston, Massachusetts office as a Design Principal. Mamayek will lead design efforts on marketing pursuits and all projects coming out of the Boston office, and will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.

He is an award-winning designer who has worked on a broad variety of complex, large-scale projects. Most recently, he was Director of Architectural Design at TRO/Jung Brannen where he led design initiatives on projects ranging from museum galleries to complex commercial developments at both a local and international level. He also has a strong background in S+T and healthcare facilities, two of HDR Architecture’s strongest markets. Some of Mamayek’s notable projects include various galleries and pavilions for the Museum of Fine Arts in Boston, Massachusetts; the Media One Tower in Dubai, UAE; the Maine General Medical Center in Augusta, Maine; and the Praecis Pharmaceuticals Headquarters in Waltham, Massachusetts, which won an AIA Honor Award for Design Excellence.

Mamyek is an active leader in local design affiliations, including the Boston Society of Architects and the ABC (A Better City) Sustainability Task Force. He’s also taught at the Boston Architectural Center as an instructor and thesis advisor. He’s a winner of the prestigious ROTCH Travelling Scholarship, which provided him the opportunity to study abroad for a year, and served on the ROTCH Committee for six years. Joe has a Bachelor of Architecture and a Bachelor of Environmental Design degree from the University of Minnesota. +

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021