The Thornton Tomasetti Board of Directors and Managing Principals announced the promotion of Brad Malmsten, P.E. to Vice President in the Fort Lauderdale office of the international engineering firm.
Malmsten joined Thornton Tomasetti in 2001 and serves as the firm’s Construction Support Services practice leader for the mid-Atlantic and South U.S. region. He has 13 years of experience in the design and analysis of concrete and steel structural systems. His portfolio includes high-rise commercial and residential buildings, educational facilities and sports venues.
He is a licensed Professional Engineer in New York and Florida. Malmsten is a member of the American Institute of Steel Construction; the American Concrete Institute and the ACI Committee 209–Creep and Shrinkage in Concrete; and the Structural Engineers Association of New York. Malmsten holds a bachelor’s degree in engineering from the University of Michigan, Ann Arbor and a master’s degree in engineering from Manhattan College in New York City. +
Related Stories
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.