flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Make-A-Wish Foundation of Southern Florida unveils design for new chapter HQ

Office Buildings

Make-A-Wish Foundation of Southern Florida unveils design for new chapter HQ

 Arquitectonica is designing the project.


By David Malone, Associate Editor | March 22, 2021
Make-A-Wish South Florida

Renderings courtesy Arquitectonica

Make-A-Wish Southern Florida has unveiled the updated design for the chapter’s proposed headquarters in Miami’s Overtown neighborhood. 

Dubbed the Finker-Frenkel Wish House, the parallelogram-shaped building features a glass facade and is being designed with the goal of extending the impact of the wish experience, establishing the organization’s permanence in the community, and advancing new revenue opportunities.

 

Make-A-Wish South Florida HQ

 

The building, designed by Aquitectonica, will span 30,000-sf and rise five stories. It will comprise 15,000-sf of office space and 15,000-sf of space that will serve as an innovative Wish House that includes emerging technology to provide children with an inspirational, fun, and safe destination to experience wishes.

Make-A-Wish Southern Florida’s current headquarters building is located in Fort Lauderdale. The Finker-Frenkel Wish House is expected to break ground in Miami this summer.

Related Stories

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

  White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 5, 2011

GREENBUILD 2011: Solar PV canopy system expanded for architectural market

Turnkey systems create an aesthetic architectural power plant. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 3, 2011

Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021