flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A major hop forward

Sponsored Content

A major hop forward

The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.


By Star Building Systems Sponsored Content | July 17, 2014
New metal buildings have helped boost productivity at Perrault Farms in Yakima V
New metal buildings have helped boost productivity at Perrault Farms in Yakima Valley, Wash., the largest hop-producing region i

Each year, when the calendar strikes August 25, the operations of Perrault Farms kick into high gear. 

For the next 35 days, the Toppenish, Wash., facilities operate around the clock to harvest, dry, bale and chill the hops that will be sold to commercial and craft brewers worldwide.   

“It’s a very perishable crop,” says Steve Perrault, president of the fourth-generation family business. “Hops are kind of like a wine grape—when they’re ready, they’re ready, and we need to be very efficient at processing them.”

Perrault commissioned new metal buildings to replace the business’ previous cramped and outdated facilities. The buildings are designed to support maximum productivity during the crop’s brief harvesting season.   

A 19,530 square-foot hop kiln building is the first stop for the green hop cones after they are stripped from the vines. In this building, propane furnaces blow hot air on the cones to remove excess moisture. The entire process takes about nine hours, 25 percent faster than at the previous facility.   

“We’ve cut down our drying time, which has also reduced our propane use and electricity substantially, so it’s a much more sustainable facility,” Perrault says. 

After drying, the cones are transported via conveyor to the adjacent 26,000 square-foot hop baling building, where they begin to cool. Ambient air blows through vented air trenches within the concrete floor slab, reducing cone temperature while eliminating the risk of spontaneous combustion. 

 

 

A four-foot cupola extending the full length of the building allows the moist, hot air to escape out of the roof. 

Next, the hop cones are compressed into 200-pound bales, stacked and transported by conveyor to the building’s refrigerated cold room where the temperature is reduced to 28 degrees Fahrenheit.

A second-story office area and conference room at the center of the building overlooks the baling operations, providing a powerful sales tool. The facility also includes a laboratory used in the business’ hop-breeding program as well as an onsite pilot brewery where new varieties of hops can be tested. 

The exteriors of both buildings feature metal panels, reinforced concrete tilt-up panels with exposed aggregate finish, and a standing seam metal roof.  

“The panels around the buildings contribute to the architectural design and also protect the structures from damage from forklifts and tractors as they maneuver around the site,” says Steve Young, general manager of Concord Construction, the Star builder in Wapato, Wash., that oversaw construction. “The concrete also adds structural strength to the hop baling building when the hops are cooling.” 

Extensive use of metal liner wall panels contributes to the structure’s interior aesthetics, and the interior space also features hot dipped galvanized structural steel on all frames, columns and rafters so they won’t be susceptible to rusting from the excess moisture in the air. 

The project also includes a 7,500 square-foot equipment cover building. 

Because the new facilities process significantly more hops than the previous ones, Perrault Farms has been able to increase the acreage of crops it plants by more than 30 percent. 

The new buildings also accommodate the stricter food safety guidelines required by craft brewers, which typically use fresh hops in their brewing process.

“With the craft brewing industry growing so rapidly, food safety is very important to all of us,” Perrault says.

The new complex has definitely impressed other hop farmers in the Yakima Valley, the largest hops-producing region in the U.S. 

“Everybody who has gone through the buildings is amazed; it’s one of the top facilities in the industry right now,” Perrault says. “This is something I had to do for the next generations coming up.” 

Project construction was completed in 10 months.

“By going with metal buildings from Star Buildings, it really decreases the construction time, which also makes it more cost-effective,” Young says.

Related Stories

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

| Aug 11, 2010

Wisconsin becomes the first state to require BIM on public projects

As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...

| Aug 11, 2010

Opening night close for Kent State performing arts center

The curtain opens on the Tuscarawas Performing Arts Center at Kent State University in early 2010, giving the New Philadelphia, Ohio, school a 1,100-seat multipurpose theater. The team of Legat & Kingscott of Columbus, Ohio, and Schorr Architects of Dublin, Ohio, designed the 50,000-sf facility with a curving metal and glass façade to create a sense of movement and activity.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â