The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.


By Star Building Systems Sponsored Content | July 17, 2014
New metal buildings have helped boost productivity at Perrault Farms in Yakima V
New metal buildings have helped boost productivity at Perrault Farms in Yakima Valley, Wash., the largest hop-producing region i

Each year, when the calendar strikes August 25, the operations of Perrault Farms kick into high gear. 

For the next 35 days, the Toppenish, Wash., facilities operate around the clock to harvest, dry, bale and chill the hops that will be sold to commercial and craft brewers worldwide.   

“It’s a very perishable crop,” says Steve Perrault, president of the fourth-generation family business. “Hops are kind of like a wine grape—when they’re ready, they’re ready, and we need to be very efficient at processing them.”

Perrault commissioned new metal buildings to replace the business’ previous cramped and outdated facilities. The buildings are designed to support maximum productivity during the crop’s brief harvesting season.   

A 19,530 square-foot hop kiln building is the first stop for the green hop cones after they are stripped from the vines. In this building, propane furnaces blow hot air on the cones to remove excess moisture. The entire process takes about nine hours, 25 percent faster than at the previous facility.   

“We’ve cut down our drying time, which has also reduced our propane use and electricity substantially, so it’s a much more sustainable facility,” Perrault says. 

After drying, the cones are transported via conveyor to the adjacent 26,000 square-foot hop baling building, where they begin to cool. Ambient air blows through vented air trenches within the concrete floor slab, reducing cone temperature while eliminating the risk of spontaneous combustion. 

 

 

A four-foot cupola extending the full length of the building allows the moist, hot air to escape out of the roof. 

Next, the hop cones are compressed into 200-pound bales, stacked and transported by conveyor to the building’s refrigerated cold room where the temperature is reduced to 28 degrees Fahrenheit.

A second-story office area and conference room at the center of the building overlooks the baling operations, providing a powerful sales tool. The facility also includes a laboratory used in the business’ hop-breeding program as well as an onsite pilot brewery where new varieties of hops can be tested. 

The exteriors of both buildings feature metal panels, reinforced concrete tilt-up panels with exposed aggregate finish, and a standing seam metal roof.  

“The panels around the buildings contribute to the architectural design and also protect the structures from damage from forklifts and tractors as they maneuver around the site,” says Steve Young, general manager of Concord Construction, the Star builder in Wapato, Wash., that oversaw construction. “The concrete also adds structural strength to the hop baling building when the hops are cooling.” 

Extensive use of metal liner wall panels contributes to the structure’s interior aesthetics, and the interior space also features hot dipped galvanized structural steel on all frames, columns and rafters so they won’t be susceptible to rusting from the excess moisture in the air. 

The project also includes a 7,500 square-foot equipment cover building. 

Because the new facilities process significantly more hops than the previous ones, Perrault Farms has been able to increase the acreage of crops it plants by more than 30 percent. 

The new buildings also accommodate the stricter food safety guidelines required by craft brewers, which typically use fresh hops in their brewing process.

“With the craft brewing industry growing so rapidly, food safety is very important to all of us,” Perrault says.

The new complex has definitely impressed other hop farmers in the Yakima Valley, the largest hops-producing region in the U.S. 

“Everybody who has gone through the buildings is amazed; it’s one of the top facilities in the industry right now,” Perrault says. “This is something I had to do for the next generations coming up.” 

Project construction was completed in 10 months.

“By going with metal buildings from Star Buildings, it really decreases the construction time, which also makes it more cost-effective,” Young says.

Related Stories

| Oct 5, 2012

2012 Reconstruction Award Silver Winner: 220 Water Street, Brooklyn, N.Y.

The recent rehabilitation of 220 Water Street transforms it from a vacant manufacturing facility to a 134-unit luxury apartment building in Brooklyn’s DUMBO neighborhood.

| Oct 5, 2012

2012 Reconstruction Award Silver Winner: Residences at the John Marshall, Richmond, Va.

In April 2010, the Building Team of Rule Joy Trammell + Rubio, Stanley D. Lindsey & Associates, Leppard Johnson & Associates, and Choate Interior Construction restored the 16-story, 310,537-sf building into the Residences at the John Marshall, a new mixed-use facility offering apartments, street-level retail, a catering kitchen, and two restored ballrooms.

| Oct 4, 2012

2012 Reconstruction Awards Silver Winner: Allen Theatre at PlayhouseSquare, Cleveland, Ohio

The $30 million project resulted in three new theatres in the existing 81,500-sf space and a 44,000-sf contiguous addition: the Allen Theatre, the Second Stage, and the Helen Rosenfeld Lewis Bialosky Lab Theatre.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.

Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.

| Oct 4, 2012

2012 Reconstruction Award Platinum Winner: Building 1500, Naval Air Station Pensacola Pensacola, Fla.

The Building Team, led by local firms Caldwell Associates Architects and Greenhut Construction, had to tackle several difficult problems to make the historic building meet current Defense Department standards having to do with anti-terrorism, force protection, blast-proofing, and progressive collapse.

| Oct 4, 2012

2012 Reconstruction Awards Platinum Winner: City Hall, New York, N.Y.

New York's City Hall last received a major renovation nearly a century ago. Four years ago, a Building Team led by construction manager Hill International took on the monumental task of restoring City Hall for another couple of hundred years of active service.

| Oct 4, 2012

BD+C's 29th Annual Reconstruction Awards

Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation and addition projects.

| Oct 4, 2012

Electronic power tool builds project transparency

As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams meet that demand.

| Oct 4, 2012

HMC Architects in service to the community

HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021