flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mace Group builds working on top of under-construction skyscrapers

AEC Innovators

Mace Group builds working on top of under-construction skyscrapers

The six-story factories eliminated the need for tower cranes, and increased productivity to the point where crews could complete 18 floors in 18 weeks.


By John Caulfield, Senior Editor | August 5, 2019
Prefab factory in the sky: Mace Group built working factories on top of under-construction high rises

U.K.-based general contractor Mace Group built working factories on top of two high rises while they were under construction in Stratford, England. The 47,355-cubic-meter factories allowed Mace to complete 18 stories in 18 weeks. Matt Gough, Mace’s Director of Innovation and Work Winning, says the factories were “cost neutral.” Photo: Mace Group

   

Mace Group is London’s largest contractor, and has been associated with some of that city’s signature projects, including its 95-story skyscraper The Shard; the 443-foot-high cantilevered observation wheel known as London Eye; and Heathrow Terminal 5, which at nearly four million sf on 640 acres is the largest freestanding structure in the United Kingdom.

Since its inception in 1990, Mace has explored where production and construction might intersect. That inquest is suddenly urgent today, as U.K. cities will need 10,500 new homes to be built per month every year through 2038. To meet that demand, the country’s construction industry must rev up its productivity by 30%. 

Recently, Mace took a step toward shifting from construction to production when it literally built factories on top of two under-construction residential towers in Stratford. Workers within those factories poured concrete, and assembled and installed prefab MEP systems, bathroom pods, risers, and façade components. The firm showcased its factory during a presentation at Autodesk University in London in June.

 

Skyscrapers rise with six-story prefab factories 

The six-story factories each weighed 510 tons and were 35 meters wide, 41 meters long, and 33 meters high. Some of their spaces were dedicated to materials delivery, façade installation, and assembling sub-assemblies. The structural engineer Davies Maguire helped Mace figure out how the building would manage that weight load. 

 

BD+C AEC Innovators, Mace Group, prefab factories in the sky, high-rise constructionPhoto: Mace Group

 

Matt Gough, Mace’s Director of Innovation and Work Winning, tells BD+C that the factories were “cost neutral” in that they eliminated the need for tower cranes, and increased productivity to the point where crews could complete 18 floors in 18 weeks. The factories reduced the project’s transportation by 40%, and its waste by 75% compared to a more conventional construction site. This project’s “gross value added” per worker, at £80 ($101.41) per hour worked, was higher than the U.K.’s average for construction and manufacturing.

“We changed the process for delivering high rises,” says Gough, even as it struggled at first to get some trades to work “in a different way.”

 

SEE ALSO: Upbrella Construction builds the roof of a structure early in the construction process, and then raise it up as the building progresses

 

In January, Mace handed over the two residential towers to their developer, a joint venture between Qatari Diar and Delancey. Stratford is Mace’s sole project with onsite factories. The contractor is open to doing more projects like it in the U.K. and elsewhere (it has a construction management office in New York). Mace’s goal is to be “manufacturing” 85% of its projects 50% faster by 2022 via just-in-time logistics and sharper site management abetted by technology.

The contractor is doing modular construction on some projects, and intends to rely more on offsite prefabrication, which could result in safer jobsites with fewer workers needed. 

 

 

 

BD+C AEC Innovators, chart displays the benefits of Mace Group's patented prefab factory construction techniqueZInfographic: Mace Group

 

Related Stories

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

Green | Mar 9, 2020

BuroHappold commits to all new building projects achieving net-zero carbon by 2030

The engineering firm also launched a long-term partnership with ILFI.

AEC Innovators | Mar 5, 2020

These 17 women are changing the face of construction

During this Women in Construction Week, we shine a spotlight on 17 female leaders in design, construction, and real estate to spur an important conversation of diversity, inclusion, and empowerment.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

AEC Innovators | Aug 27, 2019

How engineering giant BuroHappold democratizes tech innovation

The firm's Computational Collective initiative presents employees with “a different way of thinking and working.” 

AEC Innovators | Aug 26, 2019

Clayco seeks the cutting edge as a competitive advantage

Innovation has been in Clayco’s DNA since this general contractor was founded in 1984.

AEC Innovators | Aug 15, 2019

Oracle’s replica of a construction jobsite creates an immersive environment for AEC professionals

The Oracle Construction and Engineering Innovation Lab allows visitors to walk through five different stages of construction work, to test new AEC technologies and training techniques.

AEC Innovators | Aug 13, 2019

Stacking the deck: Marriott International embraces modular construction

The hotel giant has more than 50 projects in the works that incorporate prefab guestrooms or bathrooms.

AEC Innovators | Aug 9, 2019

Improving architectural designs through iteration

Computational design lets ZGF Architects see patterns that renderings and even models can’t show.

AEC Innovators | Aug 6, 2019

Structural engineer speeds skyscraper construction with novel building core design

With its Speed Core composite core wall system, Magnusson Klemencic Associates thinks it’s found a faster way to complete high-rise buildings.  

boombox1
boombox2
native1

More In Category


Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021