flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity at U.S. AEC firms up slightly

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.


By Posted by BD+C Staff | January 2, 2013

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011, according to consulting firm Morrissey Goodale, Newton, Mass. (www.morrisseygoodale.com).

One recent acquisition: Gantt Huberman Architects, a 26-person architecture/interiors firm in Charlotte, N.C., by Bergmann Associates, an architecture-engineering-planning firm headquartered in Rochester, N.Y. This makes the twelfth office for Bergmann and gives it a toehold in the Carolinas, according to Morrissey Goodale. Bergman now has 375 employees.

Meanwhile, supergiant Canadian A/E design firm Stantec, Edmonton, Alb. (2011 revenues: $463,300,000) was set to close on the acquisition of Greenhorne & O’Mara, a 520-employee engineering firm in Laurel, Md. Stantec also said it would pick up 21-person Architecture 2000, Moncton, N.B.

Other recent M&A activity of note:

  • Moseley Architects (Richmond, Va.), known as a specialist in public-sector work, merged with BeeryRio (Springfield, Va.), a specialist in the design of senior housing.
  • Haskell, an integrated designer, engineering, and construction firm based in Jacksonville, Fla., purchased H.R. Gray (Columbus, Ohio), a program management and construction services firm specializing in municipal projects.
  • Canadian giant IBI Group (Toronto) finalized the deal for M-E Companies (Columbus, Ohio), an 80-member CE firm. +

Related Stories

| Dec 9, 2012

AIA: Laboratory design, building for breakthrough science

To earn 1.0 AIA/CES learning units, study the article carefully and take the exam.

| Dec 9, 2012

The owner’s perspective: high-rise buildings

Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

| Dec 7, 2012

Structural glazing sealant protects solar-rooftop stadium in Taiwan

Designers of the Kaohsiung World Games Main Stadium in Gaoxiong, Taiwan, powered by almost 9,000 rooftop solar panels, required an effective panel fixing design offering optimum energy transfer rate, plus thermal and weathertight performance. Dow Corning specialists recommended a four-sided structural sealant solution featuring Dow Corning 983 Structural Glazing Sealant.

| Dec 6, 2012

Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities

Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021