flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity down in 2013 among architecture, engineering firms: Report

M&A activity down in 2013 among architecture, engineering firms: Report

Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. 


By Morrissey Goodale | February 5, 2014
In 2013, consultant Morrissey Goodale observed 168 sales of U.S.-based architecture and engineering (“A/E”) firms – down nearly 7% from the record 180 sales of U.S.-based A/E firms in 2012. Similarly, just 107 international A/E firms sold in 2013, a drop of more than 20% from the 135 deals in 2012. Yet 2013 was anticipated by many to be another break-neck, record-setting year for A/E industry M&A. The economy continued to recover, performance at many firms climbed back to pre-recession levels, and things were looking up for a year of rapid deal-making. So what caused industry dealmakers to slow down after living 2012 in the fast lane? 
 
·       Owners rode the (modest) wave. As the economy persisted to creep toward respectability in 2013 and value continued to build in A/E firms, prospective sellers showed an increasing reluctance to jump at offers. Instead, they were inclined to take the longer view of building a track record of solid performance, desiring to sell at the high (or at least higher) water mark that many A/E firm leaders believe is still on the horizon.
 
·       Tax-driven deal spike late in 2012. U.S. sellers seemed to be certain they needed to sell in 2012 to minimize capital gains which were anticipated to climb in 2013. We observed an unusually high flurry of deal activity in late 2012, seemingly driven by a desire to get deals done by year end. With tax rates steady for the foreseeable future, we anticipate the competitive environment, age, ownership and leadership transition, and other factors will drive owners’ desires to sell their firms.
 
·       Large firms took a breather in 2013. Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. Firms like AECOM, SNC-Lavalin, Genivar (now WSP Global), IBI Group, ARCADIS, and URS, among others, slowed or stopped their M&A programs in 2013. This decline may be attributable to the need to integrate the firms they acquired over the last few years, work on internal initiatives, or simply being unable to find and close deals that met their strategic needs at appropriate valuations in 2013.
 

About Morrissey Goodale LLC

Based in Newton, Mass., Morrissey Goodale LLC is a leading management consulting and research firm serving the architecture, engineering, and Construction (AEC) industry. 

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

| May 25, 2011

Hotel offers water beds on a grand scale

A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

| May 25, 2011

World’s tallest building now available in smaller size

Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021