flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity down in 2013 among architecture, engineering firms: Report

M&A activity down in 2013 among architecture, engineering firms: Report

Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. 


By Morrissey Goodale | February 5, 2014
In 2013, consultant Morrissey Goodale observed 168 sales of U.S.-based architecture and engineering (“A/E”) firms – down nearly 7% from the record 180 sales of U.S.-based A/E firms in 2012. Similarly, just 107 international A/E firms sold in 2013, a drop of more than 20% from the 135 deals in 2012. Yet 2013 was anticipated by many to be another break-neck, record-setting year for A/E industry M&A. The economy continued to recover, performance at many firms climbed back to pre-recession levels, and things were looking up for a year of rapid deal-making. So what caused industry dealmakers to slow down after living 2012 in the fast lane? 
 
·       Owners rode the (modest) wave. As the economy persisted to creep toward respectability in 2013 and value continued to build in A/E firms, prospective sellers showed an increasing reluctance to jump at offers. Instead, they were inclined to take the longer view of building a track record of solid performance, desiring to sell at the high (or at least higher) water mark that many A/E firm leaders believe is still on the horizon.
 
·       Tax-driven deal spike late in 2012. U.S. sellers seemed to be certain they needed to sell in 2012 to minimize capital gains which were anticipated to climb in 2013. We observed an unusually high flurry of deal activity in late 2012, seemingly driven by a desire to get deals done by year end. With tax rates steady for the foreseeable future, we anticipate the competitive environment, age, ownership and leadership transition, and other factors will drive owners’ desires to sell their firms.
 
·       Large firms took a breather in 2013. Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. Firms like AECOM, SNC-Lavalin, Genivar (now WSP Global), IBI Group, ARCADIS, and URS, among others, slowed or stopped their M&A programs in 2013. This decline may be attributable to the need to integrate the firms they acquired over the last few years, work on internal initiatives, or simply being unable to find and close deals that met their strategic needs at appropriate valuations in 2013.
 

About Morrissey Goodale LLC

Based in Newton, Mass., Morrissey Goodale LLC is a leading management consulting and research firm serving the architecture, engineering, and Construction (AEC) industry. 

Related Stories

| May 10, 2012

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.

| May 10, 2012

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Certification for existing buildings under these two rating programs has overtaken that for new construction.

| May 10, 2012

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.

| May 10, 2012

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Building Teams are employing a wide variety of components and systems in their reconstruction projects.

| May 10, 2012

Chapter 2 Exemplary High-Performance Reconstruction Projects

Several case studies show how to successfully renovate existing structures into high-performance buildings.

| May 9, 2012

Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings

As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.

| May 9, 2012

International green building speaker to keynote Australia’s largest building systems trade show

Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 9, 2012

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021