flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity down in 2013 among architecture, engineering firms: Report

M&A activity down in 2013 among architecture, engineering firms: Report

Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. 


By Morrissey Goodale | February 5, 2014
In 2013, consultant Morrissey Goodale observed 168 sales of U.S.-based architecture and engineering (“A/E”) firms – down nearly 7% from the record 180 sales of U.S.-based A/E firms in 2012. Similarly, just 107 international A/E firms sold in 2013, a drop of more than 20% from the 135 deals in 2012. Yet 2013 was anticipated by many to be another break-neck, record-setting year for A/E industry M&A. The economy continued to recover, performance at many firms climbed back to pre-recession levels, and things were looking up for a year of rapid deal-making. So what caused industry dealmakers to slow down after living 2012 in the fast lane? 
 
·       Owners rode the (modest) wave. As the economy persisted to creep toward respectability in 2013 and value continued to build in A/E firms, prospective sellers showed an increasing reluctance to jump at offers. Instead, they were inclined to take the longer view of building a track record of solid performance, desiring to sell at the high (or at least higher) water mark that many A/E firm leaders believe is still on the horizon.
 
·       Tax-driven deal spike late in 2012. U.S. sellers seemed to be certain they needed to sell in 2012 to minimize capital gains which were anticipated to climb in 2013. We observed an unusually high flurry of deal activity in late 2012, seemingly driven by a desire to get deals done by year end. With tax rates steady for the foreseeable future, we anticipate the competitive environment, age, ownership and leadership transition, and other factors will drive owners’ desires to sell their firms.
 
·       Large firms took a breather in 2013. Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. Firms like AECOM, SNC-Lavalin, Genivar (now WSP Global), IBI Group, ARCADIS, and URS, among others, slowed or stopped their M&A programs in 2013. This decline may be attributable to the need to integrate the firms they acquired over the last few years, work on internal initiatives, or simply being unable to find and close deals that met their strategic needs at appropriate valuations in 2013.
 

About Morrissey Goodale LLC

Based in Newton, Mass., Morrissey Goodale LLC is a leading management consulting and research firm serving the architecture, engineering, and Construction (AEC) industry. 

Related Stories

Market Data | May 10, 2022

Hybrid work could result in 20% less demand for office space

Global office demand could drop by between 10% and 20% as companies continue to develop policies around hybrid work arrangements, a Barclays analyst recently stated on CNBC.

Multifamily Housing | May 10, 2022

Multifamily rents up 14.3% in 2022

The average U.S. asking rent for multifamily housing increased $15 in April to an all-time high of $1,659, according to Yardi Matrix.

Headquarters | May 10, 2022

JPMorgan Chase’s new all-electric headquarters to have net-zero operational emissions

JPMorgan Chase’s recently unveiled plans for its new global headquarters building in New York City that is rife with impressive sustainability credentials.

Building Team | May 9, 2022

Cincinnati’s Andrew J Brady Music Center transforms the city’s riverfront

In Cincinnati, Ohio, the Andrew J Brady Music Center aims to connect audiences with live music while transforming Cincinnati’s riverfront.

Sponsored | Multifamily Housing | May 8, 2022

Choosing the right paver system for rooftop amenity spaces

This AIA course by Hoffmann Architects offers best practices for choosing the right paver system for rooftop amenity spaces in multifamily buildings.

Market Data | May 6, 2022

Nonresidential construction spending down 1% in March

National nonresidential construction spending was down 0.8% in March, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau.

Building Team | May 6, 2022

Atlanta’s largest adaptive reuse project features cross laminated timber

Global real estate investment and management firm Jamestown recently started construction on more than 700,000 sf of new live, work, and shop space at Ponce City Market. 

Sponsored | BD+C University Course | May 5, 2022

Designing with architectural insulated metal wall panels

Insulated metal wall panels (IMPs) offer a sleek, modern, and lightweight envelope system that is highly customizable. This continuing education course explores the characteristics of insulated metal wall panels, including how they can offer a six-in-one design solution. Discussions also include design options, installation processes, code compliance, sustainability, and available warranties.

Higher Education | May 5, 2022

To keep pace with demand, higher ed will have to add 45,000 beds by year-end

The higher education residential sector will have to add 45,000 beds by the end of 2022 to keep pace with demand, according to a report by Humphreys & Partners Architects.

Multifamily Housing | May 5, 2022

An Austin firm touts design and communal spaces in its student housing projects

Rhode Partners has multiple towers in various development stages.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021