flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Luxury residential tower breaks ground in Downtown Phoenix

Multifamily Housing

Luxury residential tower breaks ground in Downtown Phoenix

The tower will rise 26 stories.


By David Malone, Managing Editor | August 26, 2021
Skye on 6th rendering in Phoenix

Courtesy Shepley Bulfinch

Skye on 6th, a 26-story luxury apartment tower, has broken ground in downtown Phoenix’s Roosevelt Row Arts District.

The 357,850-sf building will comprise 309 apartments, 6,500-sf of ground level retail space, and a 78,000-sf parking garage with 201 spaces. The wellness focused design features a fitness center with a sauna, a steam room, and an outdoor pool and spa. A dedicated co-working floor is also included.

 

SEE ALSO: A long-gestating apartment building finally gets underway in Long Beach, Calif.

 

Designed to achieve LEED Silver certification, the building’s exterior cladding comprises floor-to-floor window wall and fly by EIFS panels. BIM is being used to coordinate all sit utility, mechanical, electrical, plumbing, and fire protection systems around the post-tension and reinforced concrete structure.

Shepley Bulfinch designed the project and Clayco is building it. Hubbard Street Group is the project’s developer. The tower is slated for completion in summer 2023.

Related Stories

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

| May 16, 2011

Autodesk and the USGBC announce multifamily design competition

Autodesk is partnering with the U.S. Green Building Council to sponsor the organization’s multifamily midrise design competition, which will give design professionals and students an opportunity to present their solutions to sustainable, multifamily midrise design.

| May 3, 2011

Would apartment shells help the housing market?

One reason the U.S. government pushed for homeownership is because it’s thought to reduce turnover and build strong communities. Owners have a vested interest in their properties whereas renters don’t—but what if were to change?

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021