flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Luxury, plant-covered hotel unveiled for site near the River Seine

Hotel Facilities

Luxury, plant-covered hotel unveiled for site near the River Seine

Kengo Kuma is designing the hotel, which will feature a large garden and a plant-covered façade. 


By David Malone, Associate Editor | June 29, 2017

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates

Designing buildings with facades that are covered in plants is becoming one of the most popular ways for architects to incorporate more greenery into urban landscapes. Agora Garden, Garden HillThe Plant, and the forest cities concept are just a few of the recent designs to put an emphasis on integrated greenery. Recently, a new plant-covered hotel design, courtesy of Kengo Kuma, was added to that transmogrifying list.

According to Dezeen, the luxury hotel, dubbed 1Hotel, will feature a façade composed of wooden blocks with a triangular profile that will be arranged vertically across the exterior of the building. Gaps will be left for plants to grow between and metal panels will be included in some spaces to reflect sunlight. Balconies will be found behind the wooden blocks on the side of the building facing the street.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

A large garden will be included at the center of the hotel complex, set between the main hotel building and the separate youth hostel. The hotel’s walls will be staggered around the central garden to create a series of large terraces and a swimming pool.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

The hotels amenities will include sports facilities, business incubators to the gardens, a restaurant, a co-working space, and, unsurprisingly, a roof terrace.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

 

Rendering courtesy of Luxigon / Mir and Kengo Kuma Associates.

Related Stories

| Feb 15, 2013

Hotel project pipeline up 5% in January

The number of hotel rooms in the construction or planning phases rose 4.9% in January compared with year-ago stats. Rooms actually under construction increased 38.3% compared with January 2012. 

| Feb 5, 2013

5 forces driving hotel investment

Jones Lang LaSalle’s Hotels & Hospitality Group believes that signs point to an on-going uptick in Americas hotel transactions activity sooner rather than later. They identify the five forces that will drive the hotel investment market during the next five years.

| Jan 16, 2013

SOM’s innovative Zhengzhou Greenland Plaza opens

The 2.59-million-square-feet building houses a mixed-use program of offices on its lower floors and a 416-room hotel.

| Nov 11, 2012

Greenbuild 2012 Report: Hospitality

Hotel boom signals good news for greener lodging facilities

| Oct 5, 2012

2012 Reconstruction Award Silver Winner: Residences at the John Marshall, Richmond, Va.

In April 2010, the Building Team of Rule Joy Trammell + Rubio, Stanley D. Lindsey & Associates, Leppard Johnson & Associates, and Choate Interior Construction restored the 16-story, 310,537-sf building into the Residences at the John Marshall, a new mixed-use facility offering apartments, street-level retail, a catering kitchen, and two restored ballrooms.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Global boom for hotels; for retail, not so much

The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.

| Jul 17, 2012

KM/Plaza changes name to Plaza Construction

Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.

| Jun 25, 2012

Living green wall planned for InterContinental Chicago

Project, with price tag of $2 million to $3 million, needs council approval.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021