flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lutron’s Commercial Experience Center awarded LEED Gold

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.


By By BD+C Staff | December 13, 2011
Lutron LEED Gold Washington DC
Lutrons Washington, D.C. facility showcases commercial products in use in a variety of vignettes such as conference rooms, and

Energy-saving light control manufacturer Lutron Electronics’ Washington, D.C. Commercial Experience Center has been awarded LEED Gold by the USGBC. LEED is the USGBC’s leading rating system for designing and constructing the world’s greenest, most energy-efficient and high-performing buildings.

Lutron Experience Centers showcase residential and commercial products and solutions. The Washington, D.C. facility specifically showcases commercial products in use in a variety of vignettes (conference rooms, offices and more).

“We’re pleased to have achieved USGBC’s LEED Gold Certification,” said Andy Wakefield, director of government relations at Lutron. “Knowing that our products contributed not only to our Gold certification, but to dozens of other building certifications throughout the country, shows the impact Lutron products and solutions can have on a building’s control strategy.”

The Experience Center was designed by DC-based architectural firm Interplan Inc. to achieve LEED certification for energy use, lighting, water and material use as well as incorporating a variety of other sustainable strategies. LEED verifies environmental performance, occupant health and financial return. LEED was established for market leaders to design & construct buildings that protect and save precious resources while also making good economic sense.

“The strength of USGBC has always been the collective strength of our leaders in the building industry," said Rick Fedrizzi, president, CEO and founding chair, USGBC. "Given the extraordinary importance of climate protection and the central role of the building industry in that effort, Lutron demonstrates their leadership through their LEED certification of their Washington, DC Experience Center.” 

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

Per the rating system, the space scored 63 out of 110 possible points. Of those 63 points, Lutron products and solutions contributed 19 points. Lutron products can help contribute up to 41 points on a project, making them effective, energy-saving solutions for any space. BD+C

Related Stories

| Aug 11, 2010

'Flexible' building designed to physically respond to the environment

The ecoFLEX project, designed by a team from Shepley Bulfinch, has won a prestigious 2009 Unbuilt Architecture Design Award from the Boston Society of Architects. EcoFLEX features heat-sensitive assemblies composed of a series of bi-material strips. The assemblies’ form modulate with the temperature to create varying levels of shading and wind shielding, flexing when heated to block sunlight and contracting when cooled to allow breezes to pass through the screen.

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021