flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lutron’s Commercial Experience Center awarded LEED Gold

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.


By By BD+C Staff | December 13, 2011
Lutron LEED Gold Washington DC
Lutrons Washington, D.C. facility showcases commercial products in use in a variety of vignettes such as conference rooms, and

Energy-saving light control manufacturer Lutron Electronics’ Washington, D.C. Commercial Experience Center has been awarded LEED Gold by the USGBC. LEED is the USGBC’s leading rating system for designing and constructing the world’s greenest, most energy-efficient and high-performing buildings.

Lutron Experience Centers showcase residential and commercial products and solutions. The Washington, D.C. facility specifically showcases commercial products in use in a variety of vignettes (conference rooms, offices and more).

“We’re pleased to have achieved USGBC’s LEED Gold Certification,” said Andy Wakefield, director of government relations at Lutron. “Knowing that our products contributed not only to our Gold certification, but to dozens of other building certifications throughout the country, shows the impact Lutron products and solutions can have on a building’s control strategy.”

The Experience Center was designed by DC-based architectural firm Interplan Inc. to achieve LEED certification for energy use, lighting, water and material use as well as incorporating a variety of other sustainable strategies. LEED verifies environmental performance, occupant health and financial return. LEED was established for market leaders to design & construct buildings that protect and save precious resources while also making good economic sense.

“The strength of USGBC has always been the collective strength of our leaders in the building industry," said Rick Fedrizzi, president, CEO and founding chair, USGBC. "Given the extraordinary importance of climate protection and the central role of the building industry in that effort, Lutron demonstrates their leadership through their LEED certification of their Washington, DC Experience Center.” 

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

Per the rating system, the space scored 63 out of 110 possible points. Of those 63 points, Lutron products and solutions contributed 19 points. Lutron products can help contribute up to 41 points on a project, making them effective, energy-saving solutions for any space. BD+C

Related Stories

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 2, 2011

Legrand joins White House initiative to spur energy efficiency in commercial buildings

Company agrees to aggressive energy savings and reporting.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Dec 1, 2011

Nauset Construction breaks ground on Massachusetts health care center

The $20 million project is scheduled to be completed by December 2012. 

| Dec 1, 2011

Ground broken on first LEED Platinum designed school house built by volunteers

Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021