flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lutron’s Commercial Experience Center awarded LEED Gold

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.


By By BD+C Staff | December 13, 2011
Lutron LEED Gold Washington DC
Lutrons Washington, D.C. facility showcases commercial products in use in a variety of vignettes such as conference rooms, and

Energy-saving light control manufacturer Lutron Electronics’ Washington, D.C. Commercial Experience Center has been awarded LEED Gold by the USGBC. LEED is the USGBC’s leading rating system for designing and constructing the world’s greenest, most energy-efficient and high-performing buildings.

Lutron Experience Centers showcase residential and commercial products and solutions. The Washington, D.C. facility specifically showcases commercial products in use in a variety of vignettes (conference rooms, offices and more).

“We’re pleased to have achieved USGBC’s LEED Gold Certification,” said Andy Wakefield, director of government relations at Lutron. “Knowing that our products contributed not only to our Gold certification, but to dozens of other building certifications throughout the country, shows the impact Lutron products and solutions can have on a building’s control strategy.”

The Experience Center was designed by DC-based architectural firm Interplan Inc. to achieve LEED certification for energy use, lighting, water and material use as well as incorporating a variety of other sustainable strategies. LEED verifies environmental performance, occupant health and financial return. LEED was established for market leaders to design & construct buildings that protect and save precious resources while also making good economic sense.

“The strength of USGBC has always been the collective strength of our leaders in the building industry," said Rick Fedrizzi, president, CEO and founding chair, USGBC. "Given the extraordinary importance of climate protection and the central role of the building industry in that effort, Lutron demonstrates their leadership through their LEED certification of their Washington, DC Experience Center.” 

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

Per the rating system, the space scored 63 out of 110 possible points. Of those 63 points, Lutron products and solutions contributed 19 points. Lutron products can help contribute up to 41 points on a project, making them effective, energy-saving solutions for any space. BD+C

Related Stories

| Feb 20, 2012

Sto Corp. announces new technical director for Canada

Edgar will have full responsibility of specifications, details, website technical content, testing and approvals, and will support the Canada sales team.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 20, 2012

All Steel names Breagy director of metro New York

Breagy is responsible for overseeing this region’s sales team while strategically coordinating the sales efforts of Allsteel dealers and representatives in the tri-state area.

| Feb 17, 2012

Tremco Inc. headquarters achieves LEED Gold certification

Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.

| Feb 17, 2012

MacInnis joins Gilbane board of directors

MacInnis is the chairman and recently retired CEO of Connecticut-based EMCOR Group, Inc.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 16, 2012

TLC Engineering for Architecture opens Chattanooga office

TLC Engineering for Architecture provides mechanical, electrical, structural, plumbing, fire protection, communication, technology, LEED, commissioning and energy auditing services.

| Feb 16, 2012

Summit Design + Build begins build-out for Emmi Solutions in Chicago

The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.

| Feb 16, 2012

Highland named president of McCarthy Building Companies’ California region

Highland moved into this new role in January 2012 following a six-month transition period with Carter Chappell, the company’s former president, California region.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021