Energy-saving light control manufacturer Lutron Electronics’ Washington, D.C. Commercial Experience Center has been awarded LEED Gold by the USGBC. LEED is the USGBC’s leading rating system for designing and constructing the world’s greenest, most energy-efficient and high-performing buildings.
Lutron Experience Centers showcase residential and commercial products and solutions. The Washington, D.C. facility specifically showcases commercial products in use in a variety of vignettes (conference rooms, offices and more).
“We’re pleased to have achieved USGBC’s LEED Gold Certification,” said Andy Wakefield, director of government relations at Lutron. “Knowing that our products contributed not only to our Gold certification, but to dozens of other building certifications throughout the country, shows the impact Lutron products and solutions can have on a building’s control strategy.”
The Experience Center was designed by DC-based architectural firm Interplan Inc. to achieve LEED certification for energy use, lighting, water and material use as well as incorporating a variety of other sustainable strategies. LEED verifies environmental performance, occupant health and financial return. LEED was established for market leaders to design & construct buildings that protect and save precious resources while also making good economic sense.
“The strength of USGBC has always been the collective strength of our leaders in the building industry," said Rick Fedrizzi, president, CEO and founding chair, USGBC. "Given the extraordinary importance of climate protection and the central role of the building industry in that effort, Lutron demonstrates their leadership through their LEED certification of their Washington, DC Experience Center.”
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
Per the rating system, the space scored 63 out of 110 possible points. Of those 63 points, Lutron products and solutions contributed 19 points. Lutron products can help contribute up to 41 points on a project, making them effective, energy-saving solutions for any space. BD+C
Related Stories
| Jul 19, 2012
AEC firms ready to dive into public projects
But the size of the pool keeps shrinking for the Top 25 AEC firms in the Government Sector.
| Jul 19, 2012
BIM finally starting to pay off for AEC firms
In surveying Giants 300 firms about BIM, we went right for the jugular: Is BIM paying off—through cost savings, higher quality, or client satisfaction? Here’s what they told us.
| Jul 19, 2012
Contractors finally ‘moving off the bottom’
C and CM Agent + PM Giants 300 Firms also taking steps to improve project efficiency.
| Jul 19, 2012
The best states for a construction job
The top anticipated engineering and skilled labor shortages according to a survey of 2,223 construction industry professionals.
| Jul 19, 2012
Suffolk Construction launches subcontractor development series
Professional certificate program to provide core construction management skills to disadvantaged, minority, and women business enterprises.
| Jul 19, 2012
Construction begins on military centers to treat TBI and PTS
First two of several centers to be built in Fort Belvoir, Va. and Camp Lejeune, N.C.
| Jul 18, 2012
U.S. engineering firms set sail for foreign ports
Other E/EA Giants 300 firms are just dipping their toes into foreign waters, still looking for international business but choosing not to establish additional offices.
| Jul 18, 2012
Architecture giants spreading their wings
A/AE Giants 300 rankings reveal firms branching out globally, merging, adding services.
| Jul 18, 2012
Green expert Kats joins GreenWizard as an advisor
Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.
| Jul 18, 2012
Construction employment stagnates in June
Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.