flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lutron introduces new roller shade fabric, Sensor Layout and Tuning Service at Greenbuild 2012

Lutron introduces new roller shade fabric, Sensor Layout and Tuning Service at Greenbuild 2012

Light control manufacturer Lutron Electronics partners with Mermet and announces new sensor calibration service.


By Posted by Raissa Rocha, Associate Editor | November 14, 2012

Light control manufacturer Lutron Electronics has partnered with Mermet, a manufacturer of solar screen fabrics, to introduce the Basketweave E Screen with KoolBlack technology at Greenbuild 2012 in San Francisco. The company has also announced its new Sensor Layout and Tuning Service to assure that wired or wireless Lutron daylight sensors and occupancy sensors help projects achieve energy-savings goals.

Conventional dark-colored shade fabrics absorb energy and increase the solar heat gain in the space, wasting energy and creating an uncomfortable environment. This limits the use of dark screen fabrics in green or sustainable building design where heat reflection is specified in a shading solution. The new KoolBlack technology solves this problem by utilizing innovative heat reflecting properties that enable the dark fabric to reflect more solar heat. The technology increases the energy efficiency of dark, solar-shade fabrics to levels comparable with light colors, reducing solar heat gain coefficients up to 23% and contributing to LEED certification. It provides exceptional glare control and allows
superior view through, comfortable work environments, and elegant street-side aesthetics while saving energy. Constructed in a 2 x 2 basket weave pattern and available in a wide array of colors, the new Basketweave E Screen with KoolBlack technology offers an ideal cost-saving solution for commercial automated shading applications.

In addition, installing occupancy sensors and daylight sensors can be an inexact science, and sensor fine-tuning is best performed after the space is fully occupied, furniture is in place, and the HVAC system is balanced to the environment. Projects that include the new Lutron Sensor Layout and Tuning Service offer building owners and facility managers the assurance that the Lutron-provided sensors will be installed and calibrated to perform as intended.

“Lutron has developed its Sensor Layout and Tuning Service to ensure that Lutron Lighting Energy Management Systems achieve their energy savings goals through properly placed and tuned sensors, and establishes one-party ownership before, during, and after construction," said Scott Hanna, Vice President, Service Solutions at Lutron.

The Sensor Layout and Tuning Service is a three-step process. A Lutron service representative will analyze reflected ceiling plans for the project and design a detailed sensor layout based on an agreed-upon sequence of operations. Prior to, or during system startup, Lutron may advise the installing contractor regarding sensor relocation in the event that conditions in the space deviate from the original drawings
Lutron will provide up to two additional on-site service visits post-startup within the first calendar year from the time the building is turned over, to fine-tune sensor calibration.

Related Stories

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 8, 2011

$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.

The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.

| Nov 4, 2011

Mortenson Construction builds its fifth wind facility In Illinois

Shady Oaks Wind Farm is under construction near Compton, Ill.

| Nov 4, 2011

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?

ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.

| Nov 4, 2011

McCarthy completes construction of South Region High School No. 2 in Los Angeles

Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021