Nationally recognized architectural, planning, and interior design firm Looney Ricks Kiss (LRK) is pleased to announce Tony Pellicciotti, AIA, CDT, LEED AP BD+C, as managing principal of its staff of over 120 across eight offices.
Pellicciotti is one of LRK’s fourteen principals representing its markets in Memphis, Dallas, Philadelphia, Orlando/Celebration, New Orleans, Baton Rouge, Little Rock, and Princeton, N.J. Pellicciotti has been with LRK for over 27 years and has consistently demonstrated outstanding project leadership, fostered collaboration, and achieved creative solutions for LRK's clients.
“With a broad, diverse range of project experience, Tony has helped establish LRK’s national expertise in historic and adaptive reuse projects. Tony practices LRK’s culture of collaboration in every project and interaction. He embodies the LRK philosophy both personally and professionally,” said Frank Ricks, FAIA, LRK founding principal, based in Memphis.
“He believes that thoughtful design inspires and motivates people to be, and to achieve, more than they thought possible, and we are confident that he will bring the same attributes to his new role," said Ricks.
GUIDED AWARD-WINNING CROSSTOWN CONCOURSE
Pellicciotti’s practice has guided and led to the social, economic, and critical successes of internationally acclaimed projects such as Crosstown Concourse, the world’s largest historic, adaptive-reuse LEED Platinum–certified project and winner of a Platinum Award in Building Design+Construction"s 2018 Building Team Awards.
He was also instrumental in the design of the Tennessee Brewery, Chisca on Main, and Orion Federal Credit Union Headquarters. Such examples have lended LRK’s adaptive reuse expertise across the country, with projects in the pipeline including current high-rise projects in Philadelphia and Salt Lake City.
Pelliccioti’s projects over the years have been recognized with numerous industry awards and featured in Building Design+Construction, MULTIFAMILY Design+Construction, Architectural Digest, Metropolis, and Contract.
“One of LRK’s greatest strengths is its mindset of a small firm, family culture, and, simultaneously, the horsepower and skill sets of a large firm," said Mike Sullivan, LRK principal based in Baton Rouge. "Built into this culture is the flexibility for team members to learn, grow, and develop expertise in project types ranging in scale and architectural stylistic responses,”
Related Stories
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.
| Jun 7, 2013
Must see: Building façade made of massive concrete drain pipes
Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.
| Jun 7, 2013
40 Under 40 retrospective: Where are they now?
Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.