flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Louisiana flood projections require urgent action, officials say

Codes and Standards

Louisiana flood projections require urgent action, officials say

The 'no net loss’ prediction now seems unrealistic.


By Peter Fabris, Contributing Editor | November 9, 2016

Pixabay Public Domain

Louisiana officials are revising the master plan for combating flooding and storm surge damage and have abandoned the projection of no net loss of land by 2035.

The new master plan, to be released in 2017, is more pessimistic than the 2012 version. State officials had thought they could stabilize land loss in the next 20 years, and then be able to add land to the coast. They now say it would take much longer to break even, and that goal may be unrealistic.

New research shows that the rates of land loss and sea level rise rise will be far greater during the last 20 years of the 50-year plan than during the first two decades. Thus, the 2017 master plan, and any work done in the next 20 years is extremely urgent.

Officials will soon announce a list of as many as 200 projects that they will include in the 2017 plan. The plan will include initiatives to build wetlands and land, build and raise levee systems across the state, and raise or relocate homes and businesses still threatened by surges and sea level rise.

Related Stories

| Jan 30, 2012

Roofer’s fatal plunge demonstrates need for fall-prevention regulations

“The biggest problem is getting our workers to use the equipment,” says Michael J. Florio, executive director of the organization.

| Jan 26, 2012

Tampa moves to streamlined online permitting system

The system will replace an inefficient patchwork of old software and is designed to provide businesses, homeowners, and contractors with online access to permitting and licensing information.

| Jan 26, 2012

EPA to collect more data, seek comments before finalizing mud rule

The EPA says it will seek more data and is accepting comments until March 5.

| Jan 26, 2012

Industry challenges Connecticut's suit over defective construction work

The dispute arose over multimillion-dollar leaks at the University of Connecticut's law library.

| Jan 26, 2012

Earthquake 'fuse' could save buildings during temblors

The idea is to use an earthquake "fuse" that can prevent the tiny fractures and warps that make structures unsafe after a quake and very expensive to repair.

| Jan 26, 2012

HPD open materials standard for green building materials gains momentum

GreenWizard, provider of a cloud-based product management and project collaboration software, is the latest industry participant to sign on

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 18, 2012

Chile's seismic code upgrades credited with saving lives in 2010 quake

Since 1960, when Chile suffered a 9.5 magnitude quake, the largest ever recorded; the country has steadily improved building codes to protect lives and property.

| Jan 18, 2012

Report analyzes residential hurricane codes in 18 states

The Insurance Institute for Business & Home Safety (IBHS) released a new report analyzing residential building codes in 18 hurricane-prone coastal states along the Gulf of Mexico and the Atlantic Coast.

| Jan 18, 2012

Death in Chicago high-rise apartment fire blamed on fire code

The death of a Chicago woman who stepped off her elevator into a blazing inferno last week has underscored the need for fire sensors in elevators.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021