flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Louisiana flood projections require urgent action, officials say

Codes and Standards

Louisiana flood projections require urgent action, officials say

The 'no net loss’ prediction now seems unrealistic.


By Peter Fabris, Contributing Editor | November 9, 2016

Pixabay Public Domain

Louisiana officials are revising the master plan for combating flooding and storm surge damage and have abandoned the projection of no net loss of land by 2035.

The new master plan, to be released in 2017, is more pessimistic than the 2012 version. State officials had thought they could stabilize land loss in the next 20 years, and then be able to add land to the coast. They now say it would take much longer to break even, and that goal may be unrealistic.

New research shows that the rates of land loss and sea level rise rise will be far greater during the last 20 years of the 50-year plan than during the first two decades. Thus, the 2017 master plan, and any work done in the next 20 years is extremely urgent.

Officials will soon announce a list of as many as 200 projects that they will include in the 2017 plan. The plan will include initiatives to build wetlands and land, build and raise levee systems across the state, and raise or relocate homes and businesses still threatened by surges and sea level rise.

Related Stories

| Aug 6, 2014

Loudoun County, Virginia may dump green building requirements

Loudoun County, Va., supervisors may do away with a county policy that requires LEED Silver certification on new county buildings.

| Aug 6, 2014

$300 million mixed-use project in Chicago’s medical district wins key approval

The Illinois Medical District Commission approved a 1.16 million-sf, $300 million mixed-use project in Chicago’s Illinois Medical District.

| Aug 4, 2014

Facebook’s prefab data center concept aims to slash construction time in half

Less than a year after opening its ultra-green, hydropowered data center facility in Luleå, Sweden, Facebook is back at it in Mother Svea with yet another novel approach to data center design.

| Jul 31, 2014

LEED Dynamic Plaque gives owners and tenants ability to monitor building performance

The LEED Dynamic Plaque could aid certified buildings in maintaining performance with up-to-date information about water and energy use, waste reduction efforts, occupant experience, and other green performance categories.

| Jul 31, 2014

Gypsum Association releases updates to wallboard repair standards

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications.

| Jul 31, 2014

Cambridge, Mass., is latest locale to require energy usage disclosure

The City Council of Cambridge, Mass., approved the Building Energy Usage and Disclosure Ordinance (BEUDO) that requires benchmarking and disclosure of building energy performance for large commercial, institutional, and multifamily buildings.

| Jul 31, 2014

Stalled $1.5 billion Miami mixed-use redevelopment project advances

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase.

| Jul 30, 2014

USGS updates National Seismic Hazard Maps

The U.S. Geological Service recently released an update of U.S. National Seismic Hazard Maps that reflect the latest analysis of where future earthquakes will occur, how frequently they may occur, and their strength.

| Jul 23, 2014

Fairfax County, Virginia toughens green standards

The Fairfax County Board of Supervisors recently strengthened its green building policy, requiring higher standards for residential, retail, office and other construction projects seeking approval for rezoning.

| Jul 23, 2014

Berkeley National Lab’s FLEXLAB is a test bed for energy efficient office design

FLEXLAB, short for the Facility for Low Energy Experiments, opened this summer at the Lawrence Berkeley National Laboratory.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021