flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Louisiana flood projections require urgent action, officials say

Codes and Standards

Louisiana flood projections require urgent action, officials say

The 'no net loss’ prediction now seems unrealistic.


By Peter Fabris, Contributing Editor | November 9, 2016

Pixabay Public Domain

Louisiana officials are revising the master plan for combating flooding and storm surge damage and have abandoned the projection of no net loss of land by 2035.

The new master plan, to be released in 2017, is more pessimistic than the 2012 version. State officials had thought they could stabilize land loss in the next 20 years, and then be able to add land to the coast. They now say it would take much longer to break even, and that goal may be unrealistic.

New research shows that the rates of land loss and sea level rise rise will be far greater during the last 20 years of the 50-year plan than during the first two decades. Thus, the 2017 master plan, and any work done in the next 20 years is extremely urgent.

Officials will soon announce a list of as many as 200 projects that they will include in the 2017 plan. The plan will include initiatives to build wetlands and land, build and raise levee systems across the state, and raise or relocate homes and businesses still threatened by surges and sea level rise.

Related Stories

Codes and Standards | Jul 19, 2017

Economic impacts of climate change will jump over next two decades

Average annual cost to buildings and infrastructure from eastern storms to rise by $7.3 billion.

Codes and Standards | Jul 18, 2017

Energy modeling yields accuracy within 4%, says new study

Results of the study support the usefulness of the practice.

Codes and Standards | Jul 13, 2017

Net Zero Energy rebranded as ‘Zero Energy’

ILF aims to make new certification the sole standard for highest performing buildings.

Codes and Standards | Jul 13, 2017

New York City creates $10 million fund to help women- and minority-owned firms win construction contracts

The money is earmarked for up to $500,000 surety bonds per contract.

Codes and Standards | Jul 12, 2017

New International Building Code allows weather-resistive barriers above 40 feet

Danger of propagating flames now deemed negligible.

Codes and Standards | Jul 10, 2017

New mass plywood panel project moves ahead with federal grant

New material is substitute for concrete and steel in multi-story projects.

Codes and Standards | Jul 6, 2017

Trump ups ante on apprenticeships, gives private sector more room to design them

Initiative aimed at alleviating construction industry worker shortage.

Codes and Standards | Jul 6, 2017

Flawed modeling to blame for green buildings failure to live up to hype on energy efficiency

Explains energy performance gap from expected savings to actual savings.

Codes and Standards | Jul 5, 2017

Research study examines tall timber buildings worldwide

Industry group developing criteria for categorizing wide range of construction approaches to tall timber buildings.

Codes and Standards | Jun 30, 2017

AAMA releases new document on aluminum fenestration and energy efficiency

The free download addresses entrances, storefront framing, curtain walls, windows and skylight fenestration systems.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021