For the past two years, the National Building Museum has put up a temporary mini-golf course for visitors to play in. But this year, they're taking museum-goers to a different place: a maze.
The maze was designed by Bjarke Ingels Group (BIG) and is a precursor to an exhibit (set for January 2015) showcasing some of the firm's projects. To navigate the maze, people must look up. Cathy Frankel, vice president for exhibitions and collections at the museum, told the Washington Post that the museum's “ubergoal is that people walk out of here looking at their built world differently. We think this is sort of on the microlevel of that—forcing people to look up [as they try to find their way through the maze] will make them look at our building differently.”
The maze actually gets easier as you go along, with the walls starting at 18 feet high and getting shorter towards the end. Frankel estimates that it takes about 40 minutes to navigate the 3,600-sf maze.
Placed in the museum's Great Hall, the maze's location may actually make it more difficult to complete. The hall is more or less symmetrical, and the walls are fairly similar, so only those sharp enough to figure out if they're facing north or south will be able to determine their location in the maze from the features of the larger room.
Related Stories
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.