flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles reverses ban on high-rise slanted roofs and spires

Los Angeles reverses ban on high-rise slanted roofs and spires

Change could help city develop distinctive skyline


By BD+C Staff | October 2, 2014
Image: Thomas Pintaric via Wikimedia Commons
Image: Thomas Pintaric via Wikimedia Commons

Los Angeles reversed course last month on a regulation that had barred skyscrapers from having slanted roofs or spires. Most high-rises in the city have flat-topped roofs due to a decades-old rule meant to boost fire safety by requiring helicopter landing pads atop tall buildings.

The rule was unique among large cities in the U.S., according to city officials. New technology and design techniques have removed the need for such a rule, city officials say.

Architects had decried the old rule, saying it restricted creative building tops and prevented L.A. from having a distinctive skyline.

Under the new rule, builders will be able to construct high-rises that don’t have a helicopter pad on the roof if they include other safety features such as a fire service elevator or another set of exit stairs, automatic sprinklers, and a video surveillance system.

“Anyone who’s been to New York or cities like Shanghai, Hong Kong, and even San Francisco can see how the tops of building can help to define the identity of a city,” former City Councilman Mike Woo told the Los Angeles Times. “But for Los Angeles, for years, we have limited ourselves.”

(http://www.latimes.com/local/lanow/la-me-ln-skyscraper-flat-top-fire-rule-spires-20140929-story.html)

 

 


 

 

 

Related Stories

Codes and Standards | Aug 28, 2017

Commercial properties address state carbon-reduction policies

EV charging stations, batteries, and microgrid technology are all part of effort to meet demand for cleaner power.

Codes and Standards | Aug 24, 2017

OSHA silica dust exposure enforcement begins Sept. 23

Vacuum dust collection, water-delivery systems, and respirators will be required.

Codes and Standards | Aug 18, 2017

Cool roofs may increase air pollution

California’s requirement for cool roofs on new non-residential buildings could promote smog.

Codes and Standards | Aug 17, 2017

Black market sales of OSHA training certifications plague New York City construction industry

Task force formed to get fake training cards off the streets and workers properly trained.

Codes and Standards | Aug 16, 2017

Big changes coming to Ontario building code

Proposals include solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.

Codes and Standards | Aug 14, 2017

New edition of AISC Steel Construction Manual now available

Includes the 2016 Specification for Structural Steel Buildings.

Codes and Standards | Aug 10, 2017

AAMA releases updated Standard Test Method for Water Penetration Using Dynamic Pressure

The update applies to windows, curtain walls, and doors.

Codes and Standards | Aug 9, 2017

UpCodes aims to make researching building codes, regulations easier through searchable app

App currently includes building codes of 40 states and New York City.

Codes and Standards | Aug 8, 2017

3D printing industry working to implement standards for products, processes

Additive Manufacturing Standardization Collective (AMSC) will develop industry-wide additive manufacturing standards and specifications.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021