flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles mixed-use building uses prefabricated wood frame to reduce costs

Mixed-Use

Los Angeles mixed-use building uses prefabricated wood frame to reduce costs

SPF:architects designed the building.


By David Malone, Associate Editor | May 16, 2018
The Line Lofts exterior

Photo: Bruce Damonte.

A new six-story residential building in Los Angeles provides 82 units in a tight 182-foot by 127-foot lot. The design of the building put an emphasis on natural light and using its small space as efficiently as possible.

The ground floor of The Line Lofts is concrete, but floors two through six use prefabricated wood framing to reduce costs and shorten the construction schedule. The facade is a combination of corrugated metal and plaster. The metal panels were designed as a rainscreen system to provide a more breathable and energy-efficient exterior skin.

 

The lobby of The line LoftsPhoto: Bruce Damonte.

 

Throughout the interior are multiple vertical multi-floor connections. The second and third floors are linked, the fifth and sixth are joined, and an open-to-sky “courtyard” merges with the sixth floor. Egress stairs were moved to the exterior to free up more interior space and encourage residents to use the stairs as alternative building circulation.

 

The Line Lofts studio apartmentPhoto: Bruce Damonte.

 

Amenity areas include a workspace and wet bar in the lobby, a courtyard pool, a pool lounge recreation room with floor-to-ceiling glass walls, and a sky lounge that tops the building.

Apartment units are available in studio, one-, and two-bedroom layouts of both single and two-level. Units range from 480 sf to 1,265 sf. The project also includes a 1,100-sf ground floor retail unit. SPF:architects designed the $21 million, 68,000-sf building.

 

The Line Lofts pool courtyardPhoto: Bruce Damonte.

 

The Line Lofts sky loungePhoto: Lauren Moore.

 

The Line Lofts pool loungePhoto: Bruce Damonte.

Related Stories

Mixed-Use | Jan 18, 2017

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

The oft-delayed project was set to begin in 2007 but was halted due to the recession.

Mixed-Use | Dec 1, 2016

Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water

The Sluishuis employs a unique shape that makes it appear different from every vantage point.

Mixed-Use | Dec 1, 2016

Initial work on mixed-use development, The Parks at Walter Reed, is underway

The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

Office Buildings | Nov 15, 2016

Under Armour unveils phase one of 50-acre Baltimore headquarters

The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.

Mixed-Use | Nov 10, 2016

Terraced mixed-use development planned for Shanghai’s urban city ring

The development will be highly accessible and provide ‘humanism’ to the area.

High-rise Construction | Nov 1, 2016

Winthrop Square will give rise to Boston’s second tallest building

The building will become the tallest residential tower in the city.

Mixed-Use | Oct 31, 2016

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.

Mixed-Use | Sep 27, 2016

10 Design wins competition to design huge mixed-use development in China

China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021