flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles mayor proposes earthquake retrofit program

Los Angeles mayor proposes earthquake retrofit program

Pre-1978 apartment buildings and pre-1976 concrete buildings would be impacted


By Peter Fabris, Contributing Editor | December 11, 2014
Photo: Thomas Pintaric via Wikimedia Commons
Photo: Thomas Pintaric via Wikimedia Commons

Los Angeles Mayor Eric Garcetti has proposed major investments to retrofit older buildings to make them more resilient to earthquakes. The ambitious program would focus on some apartment buildings built before 1978 and concrete buildings constructed before 1976.

The plan also includes upgrading the city's water infrastructure. Garcetti said retrofits would cost billions of dollars, which would be borne by the public and private sectors.

The measures target pre-1978 apartment buildings with weak first floors, many of which were built over parking garages supported by narrow columns. Landlords would have to upgrade these structures within five years, costing an estimated $5,000 per unit.

Pre-1976 concrete buildings with columns and frame connectors that are brittle and can break during an earthquake would have to be upgraded within 25 years at an estimated cost of $10 to $15 a square foot. The proposal requires City Council approval.

(http://www.reuters.com/article/2014/12/09/us-usa-earthquake-california-idUSKBN0JN02D20141209)

Related Stories

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

Codes and Standards | Mar 12, 2018

L.A. mayor proposes mandatory seismic retrofits for steel buildings, daycare centers, private schools

Los Angeles Mayor Eric Garcetti has proposed a seismic retrofit requirement for vulnerable steel buildings built before the 1994 Northridge earthquake.

Codes and Standards | Mar 8, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Mar 7, 2018

Dept. of Energy says 2016 ANSI/ASHRAE/IES Standard 90.1 would save 8.2% of energy costs

Favorable comparison to 2013 standard for commercial buildings.

Codes and Standards | Mar 6, 2018

Well Living Lab launches extensive study on how indoor environments affect people’s lives

Factors that impact health, performance, stress and resiliency, sleep, and comfort to be scrutinized.

Codes and Standards | Mar 5, 2018

New guide helps planners assess innovation districts

The document is designed to aid in targeting resources toward innovative and inclusive economic development based on an area’s unique strengths and challenges.

Codes and Standards | Mar 1, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Feb 27, 2018

Smart surface solutions can improve disaster resilience, health and comfort in cities

Stormwater management, water quality, and heat island effect could all be impacted.

Codes and Standards | Feb 26, 2018

Bolstering energy efficiency would produce significant health benefits, ACEEE study says

Reducing energy consumption by 15% would save six lives a day.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021