flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lord Aeck Sargent's post-Katerra future, with LAS President Joe Greco

Architects

Lord Aeck Sargent's post-Katerra future, with LAS President Joe Greco

Lord Aeck Sargent President Joe Greco talks about the architecture firm's strategies for growth as it re-emerges from Katerra ownership.


By BD+C Staff | August 5, 2021
Lord Aeck Sargent's Post-Katerra Future, with LAS President Joe Greco
Lord Aeck Sargent's Post-Katerra Future, with LAS President Joe Greco

After three years under the ownership of Katerra, which closed its North American operations last May, the architecture firm Lord Aeck Sargent is re-establishing itself as an independent company, with an eye toward strengthening its eight practices and regional presence in the U.S. In this exclusive interview for HorizonTV, BD+C's John Caulfield talks with Joe Greco, AIA, LEED AP, Lord Aeck Sargent's President and Principal.
Ā 


Ā Check out more exclusive video content from the BD+C editorial team at HorizonTV: https://www.horizontvweb.com.


Ā 

Related Stories

BIM and Information Technology | Apr 9, 2015

A carboard box by Google can bring virtual reality to architecture

The global search engine giant has launched a new product,Ā Google Cardboard, that easily allows users to experience virtual reality.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test.Ā 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, thereā€™s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big Dā€™s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallasā€™s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built bothā€”in the same building.

Building Team Awards | Apr 9, 2015

ā€˜Prudent, not opulentā€™ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Cultural Facilities | Apr 7, 2015

Miesā€™ Martin Luther King Jr. Library to get makeover

The architects say the modernization aims to improve ā€œMies in a contemporary Miesian way.ā€

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā