flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

London’s new ‘Can of Ham’ office building completes construction

Office Buildings

London’s new ‘Can of Ham’ office building completes construction

Foggo Associates designed the building.


By David Malone, Associate Editor | October 23, 2019
70 St Mary Axe

All images courtesy Foggo Associates

Would you like a side of ham with that gherkin? With the addition of Foggo Associates new “Can of Ham” office tower, describing London’s skyline is beginning to become more akin to reading from the shelves of your local grocery store.

Taking its nickname from its unique arched shape, 70 St. Mary Axe is a 446,863-sf, 21-story office tower that is the newest addition to a cluster of towers in the City of London. The building’s scheme provides efficient, flexible office space organized around a central core. Retail accommodation and public realm enhancements are incorporated at the ground level.

 

70 St Mary Axe during the day

 

A double-height reception area with a front desk created as a one-off art installation, welcomes visitors into the building. 70 St. Mary Axe was created with movable walls for maximum flexibility. The 70 SMA app can be used to order food from the various coffee shops and cafes, book time in the building’s fitness amenities, hire the building’s bikes, or book meeting rooms and event spaces. Lounge spaces on the mezzanine level and the second floor are available to tenants with no booking required. Additionally, 70 St. Mary Axe has 328 cycle spaces on site and has achieved CS Platinum, the highest level of cycling score certification.

 

70 St Mary Axe curving facade

 

The distinctive height and form of the building were designed in response to strategic local views. Solar heat gains to the office space are reduced thanks to vertical shading fins on the curved facades and glazed double wall cladding on the end elevations. Borehole thermal energy storage and energy piles are also included to help the building achieve low carbon emissions.

Unfortunately for the Can of Ham and its new neighbors the Gherkin and the Cheese Grater, the Tulip will not be joining them as part of London’s colorfully-named skyline.

 

70 St Mary Axe at dusk

Related Stories

Office Buildings | Mar 5, 2015

Goettsch Partners unveils plans for dual office towers in Warsaw

The Mennica Legacy Tower development is divided into a 35-story tower located on the south east side of the site and a 10-story building on the west side.

High-rise Construction | Mar 4, 2015

Must see: Egypt planning 656-foot pyramid skyscraper in Cairo

Zayed Crystal Spark Tower will stand 200 meters tall and will be just a short distance from the pyramids of Giza. 

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

Office Buildings | Mar 3, 2015

Former DuPont lab to be converted into business incubator near UPenn campus

The new Pennovation Center will provide collaborative and research spaces for educators, scientists, students, and the private sector.

Office Buildings | Mar 1, 2015

Google unveils dramatic tent-like, modular-focused plan for corporate HQ

The master plan by Bjarke Ingels and Thomas Heatherwick will wrap highly flexible office blocks in soaring translucent canopies.

Office Buildings | Feb 26, 2015

Using active design techniques to strengthen the corporate workplace and enhance employee wellness

The new Lentz Public Health Center in Nashville, Tenn., serves as a model of how those progressive and healthy changes can be made.

Sponsored | Shopping Centers | Feb 26, 2015

A color-changing gateway for Altara Center

Valspar works with developers to complete a multicolored shopping center façade in Honduras.

Office Buildings | Feb 23, 2015

The importance of quiet and the consequences of distraction

Recent work style studies show that the average knowledge worker spends 25-35% of their time doing heads-down focused work. Once thrown off track, it can take some 23 minutes for a worker to return to the original task.

Codes and Standards | Feb 18, 2015

USGBC concerned about developers using LEED registration in marketing

LEED administrators are concerned about a small group of developers or project owners who tout their projects as “LEED pre-certified” and then fail to follow through with certification.

Office Buildings | Feb 18, 2015

Commercial real estate developers optimistic, but concerned about taxes, jobs outlook

The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021