flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

London’s new ‘Can of Ham’ office building completes construction

Office Buildings

London’s new ‘Can of Ham’ office building completes construction

Foggo Associates designed the building.


By David Malone, Associate Editor | October 23, 2019
70 St Mary Axe

All images courtesy Foggo Associates

Would you like a side of ham with that gherkin? With the addition of Foggo Associates new “Can of Ham” office tower, describing London’s skyline is beginning to become more akin to reading from the shelves of your local grocery store.

Taking its nickname from its unique arched shape, 70 St. Mary Axe is a 446,863-sf, 21-story office tower that is the newest addition to a cluster of towers in the City of London. The building’s scheme provides efficient, flexible office space organized around a central core. Retail accommodation and public realm enhancements are incorporated at the ground level.

 

70 St Mary Axe during the day

 

A double-height reception area with a front desk created as a one-off art installation, welcomes visitors into the building. 70 St. Mary Axe was created with movable walls for maximum flexibility. The 70 SMA app can be used to order food from the various coffee shops and cafes, book time in the building’s fitness amenities, hire the building’s bikes, or book meeting rooms and event spaces. Lounge spaces on the mezzanine level and the second floor are available to tenants with no booking required. Additionally, 70 St. Mary Axe has 328 cycle spaces on site and has achieved CS Platinum, the highest level of cycling score certification.

 

70 St Mary Axe curving facade

 

The distinctive height and form of the building were designed in response to strategic local views. Solar heat gains to the office space are reduced thanks to vertical shading fins on the curved facades and glazed double wall cladding on the end elevations. Borehole thermal energy storage and energy piles are also included to help the building achieve low carbon emissions.

Unfortunately for the Can of Ham and its new neighbors the Gherkin and the Cheese Grater, the Tulip will not be joining them as part of London’s colorfully-named skyline.

 

70 St Mary Axe at dusk

Related Stories

| Dec 6, 2011

New office building features largest solar panel system in New Orleans

Woodward Design+Build celebrates grand opening of new green headquarters in Central City.

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

boombox1
boombox2
native1

More In Category

Office Buildings

Unlocking Sustainability: Smart Access in the Coworking Space

Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover 
how choosing the right partners can amplify your green efforts.


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021