flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

London plans to build Foggo Associates' 'can of ham' building

Office Buildings

London plans to build Foggo Associates' 'can of ham' building

Once completed, London’s skyline will be ready for a picnic


By BD+C Staff | January 27, 2015
London goes through with Foggo Associates' "can of ham" building
London goes through with Foggo Associates' "can of ham" building

First came the Gherkin, and then the cheesegrater. Soon, the "can of ham,"  or the giant “tin of potted swine,” as CityLab puts it, will join the gastronomy-meets-architecture clump of skyscrapers in London’s business district.

Designed by Foggo Associates, the building was originally approved back in 2010, but the financial crisis rendered the project dormant. Only recently did the project show new signs of life, when construction company Mace announced that it had been appointed to a pre-constructional deal to build “the much delayed ‘can of ham’ on 60-70 St. Mary Axe.”

According to CityLab, the development, reportedly more than $150 million, will include 24 stories of offices and retail space.

The reasoning behind this arch shape is for the tower to respect existing views through the city of London, Dezeen reports. The vertical shading fins will wrap around the curved outer walls, and the glazed end elevations will reduce solar gain.

 

Related Stories

Office Buildings | Jun 3, 2021

What's next for workplace design?

Balancing personal space and the need for collaboration.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Office Buildings | May 18, 2021

“The Beam” will be Arizona’s first CLT project

RSP Architects designed the building.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Steel Buildings | Apr 17, 2021

Speed Core wall system is used for the second time in office building in San Jose

The construction method is expected to knock off three months from the project’s schedule.

Office Buildings | Apr 5, 2021

FXCollaborative selected to create new lobby, amenity space for 3 Times Square

FXCollaborative designed the original building in 2001.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021