flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

London office building employs transitional forms to mediate between the varied heights of surrounding buildings

Office Buildings

London office building employs transitional forms to mediate between the varied heights of surrounding buildings

Friars Bridge Court will provide a transition between the unvarying height of the buildings to the south and the more varied heights of the northern buildings.


By David Malone, Associate Editor | February 8, 2017

Rendering courtesy of PLP Architecture.

The site for a new 21-story office building, dubbed Friars Bridge Court, from PLP Architecture is unique in terms of the surrounding architecture. The new building will replace an old office building from 1991 at the northern end of Blackfriars Road in the London Borough of Southwark. What makes the site unique, and, ultimately, what will make the building itself unique, is that buildings fairly uniform in height characterize the southern half of Blackfriars Road, but the northern half has a more varied street wall that culminates in a series of object towers near the northern terminus, according to the architect’s website.

In an effort to complement both the southern and northern buildings, the new tower will employ a series of transitional elements into its design. As the firm explains on its website, the building “is designed to strengthen the end of the block in which it sits and announce through its scale the transition to the more singular buildings towards the river.”

The design proposes a “volumetric extrusion” of a height similar to that of the mid-rise buildings nearby. The volume is then split vertically into two volumes. The Western volume is lowered in order to establish a street height with the other buildings adjoining the site. The volume, which has already been divided into two, is then divided further, horizontally across its base this time, to form an upper and lower component.  The lower component, which includes the shorter western volume to form an “L” shape, is meant to anchor the building into the immediate context (meaning the uniform, smaller buildings on the south side of the street), while the upper component is to be perceived in the wider townscape setting.

Between the upper and lower volumes will be a large gallery space, providing open views into and out of the building. This gallery space exists at a point that works to strengthen datum lines on the facades of surrounding buildings. A recessed double-height lobby space is added at the ground level.

The building’s form is not the only transitional aspect of the tower. The masonry envelope will also differ between volumes. The lower portion of the building will be clad in a denser grain façade expressed through the use of light-colored brick. The upper volume’s facade will be a light sandstone colored mineral finished grid.

The result of all of these transitional elements is a building that manages to fit in with the smaller buildings immediately surrounding it while also softening the height difference between the southern and northern buildings.

The completed tower will provide 196,800 sf of office space and 7,300 sf of retail space.  Additionally, the tower will emphasize flexibility in its office space, something the old building could not provide. Friars Bridge Court will also provide amenity spaces and two roof top terraces.

 

Rendering courtesy of PLP Architecture.

Related Stories

Office Buildings | Mar 19, 2018

The new office has roots in retail

How retail’s focus on brand authenticity, heritage and education are transforming workplace design.

Office Buildings | Mar 13, 2018

Using workplace data to create connected communities

Workplace data is being put to use by corporate service groups to provide a better employee experience and empower the businesses that are their customers.

Office Buildings | Mar 12, 2018

Sound advice on workplace design

Thoughtful design, paired with a change management program to educate staff, can both enhance connectivity and minimize distractions.  

Glass and Glazing | Mar 5, 2018

New $5 Billion Apple Headquarters Has a Glass Problem

The substantial use of glass on the interior of Apple Park has caused headaches for some employees, literally.

Office Buildings | Mar 2, 2018

Give your HQ some heart: Creating branded workplaces

These days, if your office space isn’t a true reflection of your brand, you’ve missed a big opportunity to connect with your audience.

Office Buildings | Feb 23, 2018

Why the 'cultural fit' doesn't fit

Evidence shows that companies that hire on or emphasize cultural fit struggle to innovate and change.

Office Buildings | Feb 20, 2018

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021