flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Loews Hotels & Resorts announces major cross-portfolio upgrades

Loews Hotels & Resorts announces major cross-portfolio upgrades

Plan will improve 15 of the company's 19 properties, focusing on public spaces and connectivity.


By Loews Hotels & Resorts | September 13, 2013
Loews Coronado Bay Resort, San Diego, recently completed a nine-month transforma
Loews Coronado Bay Resort, San Diego, recently completed a nine-month transformation that included a complete redesign of its lobby, Bay Terrace, Cays Lounge, Market Caf, and Market-to-Go.

Loews Hotels & Resorts is currently in the midst of a major growth and property redesign initiative, reflecting a strong national trend in hospitality renovation. The project touches 15 of the company's 19 properties, including 10 property renovations, three hotel acquisitions, and two new builds, ranging from updates to the building facades and the hotel lobbies, to new color palettes and renovated bathrooms.
 
With the redesign, Loews Hotels & Resorts puts an emphasis on repositioning the lobby and public spaces as areas for gathering and connectivity. Loews approached this goal by installing media walls with LCD flat screen TVs, increasing WiFi access and making electrical outlets more abundant and accessible. The design upgrades will also allow for more live entertainment and activity, which will encourage hotel guests and locals alike to utilize the public spaces for social interaction.
 
Beyond this common vision for more connectivity, each property takes a completely unique design approach. All the venues in the Loews portfolio have their own story, history and local character so there are no repeated design ideas from one property to the next.
 
Renovation highlights include top to bottom upgrades at the newly acquired Loews Hollywood Hotel, the extensive overhaul of Portofino Bay’s 750 rooms and suites, and the first ever, full renovation of the flagship location, Loews Regency Hotel, which is set to reopen early 2014. Below is a complete timeline and overview of the various renovations. 

Renovation Timeline

Loews Annapolis Hotel completed an extensive renovation of its lobby and restaurant in August of 2012.

Loews Coronado Bay Resort completed a nine-month long transformation that included a complete redesign of its lobby, Bay Terrace, Cays Lounge, Market Café and Market-to-Go in January of 2013.

Loews Philadelphia Hotel completed a three-month long guestroom renovation in April of 2013. The hotel will undergo a total transformation of its lobby, entrance and restaurant/bar area in the coming year.

Loews Portofino Bay Hotel completed an immense renovation project that refreshed all 750 rooms and suites with a new Mediterranean-inspired design that enhances the overall guest experience in April of 2013.

Loews Santa Monica Beach Hotel completed a façade renovation in April of 2013 and will finish renovation of a series of rooms adjacent to the pool to create premium poolside cabana rooms, as well as a series of beach-level rooms that will feature residential-style patios, complete with fire pits later this year.

Loews Vanderbilt Hotel completed an extensive renovation including a complete redesign of the lobby, remodeled corridors, new guest and public bathrooms, and the new Mason’s restaurant and Mason Bar in May of 2013.

Loews Hôtel Vogue – completed a property renovation including redesigned guest rooms, an updated lobby, exterior façade and the addition of the renowned La Société Bistro from Toronto, in June of 2013.

Loews Hollywood Hotel acquired the historic Hollywood Hotel, home to the former Kodak Theater, now the Dolby Theater, a major partner of the annual Academy Awards ceremony completed in the summer of 2012. Hotel is currently undergoing a renovation of all guestrooms, the lobby, lobby bar, restaurant and meeting spaces, scheduled for completion in November of 2013.

Loews Regency Hotel – undergoing its first-ever full renovation in its 50-year history. The redesign will maintain the traditional elements that helped shape the hotel as a New York Institution, but will be complemented by new modern touches that will still uphold the overall Loews Regency legacy. The hotel is set to re-open in January of 2014.

Loews Boston Back Bay Hotel acquired the 225-room Back Bay Hotel in Boston in February of 2013 and renovations are scheduled to begin in the fall of this year finished in April of 2014

Related Stories

AEC Tech | Jan 27, 2023

Epic Games' latest foray into the AEC market and real estate industry

From architecture to real estate, the realm of computer-aided design hits new heights as more and more firms utilize the power of Epic Games’ Twinmotion and Unreal Engine.

University Buildings | Jan 27, 2023

Ozarks Technical Community College's advanced manufacturing center is first-of-a-kind in region

The new Robert W. Plaster Center for Advanced Manufacturing at Ozarks Technical Community College in Springfield, Mo., is a first-of-a-kind educational asset in the region. The 125,000-sf facility will educate and train a new generation in high tech, clean manufacturing and fabrication.

Mass Timber | Jan 27, 2023

How to set up your next mass timber construction project for success

XL Construction co-founder Dave Beck shares important preconstruction steps for designing and building mass timber buildings.

Sports and Recreational Facilities | Jan 26, 2023

Miami’s motorsport ‘country club’ to build sleek events center

Designed by renowned Italian design firm Pininfarina and with Revuelta as architect, The Event Campus at The Concours Club will be the first and only motorsport-based event campus located within minutes of a major metro area.

Student Housing | Jan 26, 2023

6 ways 'choice architecture' enhances student well-being in residence halls

The environments we build and inhabit shape our lives and the choices we make. NAC Architecture's Lauren Scranton shares six strategies for enhancing well-being in residence halls.

K-12 Schools | Jan 25, 2023

As gun incidents grow, schools have beefed up security significantly in recent years

Recently released federal data shows that U.S. schools have significantly raised security measures in recent years. About two-thirds of public schools now control access to school grounds—not just the building—up from about half in the 2017-18 school year. 

AEC Tech Innovation | Jan 24, 2023

ConTech investment weathered last year’s shaky economy

Investment in construction technology (ConTech) hit $5.38 billion last year (less than a 1% falloff compared to 2021) from 228 deals, according to CEMEX Ventures’ estimates. The firm announced its top 50 construction technology startups of 2023.

Sports and Recreational Facilities | Jan 24, 2023

Nashville boasts the largest soccer-specific stadium in the U.S. and Canada 

At 30,105 seats and 530,000 sf, GEODIS Park, which opened in 2022, is the largest soccer-specific stadium in the U.S. and Canada. Created by design firms Populous and HASTINGS in collaboration with the Metro Nashville Sports Authority, GEODIS Park serves as the home of the Nashville Soccer Club as well as a venue for performances and events.

Concrete | Jan 24, 2023

Researchers investigate ancient Roman concrete to make durable, lower carbon mortar

Researchers have turned to an ancient Roman concrete recipe to develop more durable concrete that lasts for centuries and can potentially reduce the carbon impact of the built environment.

Architects | Jan 23, 2023

PSMJ report: The fed’s wrecking ball is hitting the private construction sector

Inflation may be starting to show some signs of cooling, but the Fed isn’t backing down anytime soon and the impact is becoming more noticeable in the architecture, engineering, and construction (A/E/C) space. The overall A/E/C outlook continues a downward trend and this is driven largely by the freefall happening in key private-sector markets.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021